Difference between revisions of "Off-line analysis"

From PolWiki
Jump to navigationJump to search
Line 1: Line 1:
 
== List of changes in Run parameter ==
 
== List of changes in Run parameter ==
 
'''Run number range : Event'''
 
'''Run number range : Event'''
 +
*23211 ...    : accumulation trigger changed from 2-plane to 3-plane
 
*23677 - 23765 : the laser cycle On:Off period was changed from regular 60:30 to 50:25
 
*23677 - 23765 : the laser cycle On:Off period was changed from regular 60:30 to 50:25
 
*23766 - 23773 : beam off, calib input runs
 
*23766 - 23773 : beam off, calib input runs

Revision as of 17:21, 23 February 2012

List of changes in Run parameter

Run number range : Event

  • 23211 ... : accumulation trigger changed from 2-plane to 3-plane
  • 23677 - 23765 : the laser cycle On:Off period was changed from regular 60:30 to 50:25
  • 23766 - 23773 : beam off, calib input runs
  • 23774 - 23835 : beam off, (LED linearity tests, DAQ tests etc)
  • 23836 - 23913 : transverse regular running
  • 23914 - 23926 : transverse running, I=75, edet trigger Gatewidth scan
  • 23933 ... : regular longitudinal running , I = 180uA
  • 23939 - 23945 : edet trigger gatewidth scan
  • 23946 ... : 3-plane trigger, all planes including sich channels of plane-4 unmasked

How-to