Compton Meeting, May 23, 2011

From PolWiki
Revision as of 12:19, 23 May 2011 by Dalton (talk | contribs)
Jump to navigationJump to search

Agenda

Doodle poll reminder

Laser

  1. Update on plans for laser work (Mark)
    1. Kent's Transfer function measurement note https://qweak.jlab.org/elog/Laser/93
    2. Designing mount for transfer function
    3. Summer intern (Brandon Cavness) arrives tomorrow

Photon detector

  • Replay (wdc):
    • On ifarml, aim for middle of June
    • All resulting ROOT files will be stored on work disk
    • Replay will include all macros as well
    • Prereq: full BCM/BPM analysis
  • Photon detector analyzer status:
    • Scaler BCM/BPM read-out status (jc)
    • What else? (excl. electron det)
  • PbWO4:
    • Summary meeting with Hamlet last Wednesday (kent/mark/dave/wdc)
    • Dual pulser linearity test system (pulser logic) (jc?)
  • DAQ summer plans:
    • Increase data transfer speed to allow for more snapshots/longer sample windows
    • Coincidence mode: What specs? Are we happy with what we have (Mark's accumulator mode response function)?

Electron detector

Attendance

Mark, Amrendra, Wouter, JC, Kent, DD, Don

Minutes

Laser

Photon detector

Electron detector