Compton Meeting, June 2, 2011

From PolWiki
Revision as of 10:11, 2 June 2011 by Wdconinc (talk | contribs) (→‎Minutes: Laser)
Jump to navigationJump to search

Previous Meeting: Compton Meeting, May 23, 2011

Following Meeting:

Agenda

Laser

  1. Final dates for RadCon support
  2. Transfer function measurement
  3. Modifications to the LabView program

DAQ

  1. Update on summer upgrade plans

Photon detector

  1. Replay:
    1. Pedestals
    2. Analyzer status
  2. PbWO4:
    1. Detector modification update

Electron detector

  1. Analysis
    1. Update on analysis



Minutes

  • Introduction Seth, working as REU summer student on LabView controls for laser polarization measurement
  • Laser
    1. Mark will create atlis for radcon support to break vacuum
    2. LabView (Seth)
      • got used to LabView during first week
      • laser polarization measurement when light comes out of cavity (rotate polarizer to measure linear polarization)
      • added pause button, added delay to flipper (get rid of early signal spike)
      • all channels on same graph, working on error bars now
    3. Postpone transfer function measurement until after Qweak collab meeting (June 22--24), now start on June 27, Mark will double-check for conflicts with SAD schedule
    4. Measure gain/linewidth/etc precisely for NIM paper on laser cavity