Compton Meeting, September 21, 2011

From PolWiki
Jump to navigationJump to search

Agenda

Laser

  1. Cavity upgrade progress

Photon Detector

  1. LED system
  2. Cooling system update

Electron Detector

  1. Analysis update - dependence on dipole B-field knowledge
  2. QWAD installation update
  3. Installation progress

DAQ

  1. BPM/V2F issue: Might be the snake head. After putting a DAC that changes voltage every 1000 helicity windows, the 3P02A Y- remains unchanged.

Simulation

  1. There is no end in sight to Dave's procrastination

Miscellaneous

  1. New cables pulled - (still) not terminated

Other stuff

  1. Dave G. out of town next week - you're on your own.