Compton Meeting, December 8, 2011

From PolWiki
Revision as of 09:53, 8 December 2011 by Gaskelld (talk | contribs)
Jump to navigationJump to search

Agenda

Laser

  1. Entrance function analysis (maybe defer until Mark returns)

Photon Detector

  1. LED system
  2. Analysis --> scripts?
  3. Scanner detector - more results

Electron Detector

  1. Further commissioning
    1. List of tests
    2. Schedule
  2. Detector motion reproducibility: what's going on??
  3. Systematic uncertainties - it would be nice to start a summary document/report

Analysis

  1. Can we revert to old root tree structure?
  2. BPM calibrations (DG has some pedestals)
  3. BCM calibrations
  4. Edet analysis from root trees