User contributions
From PolWiki
Jump to navigationJump to search- 08:27, 7 December 2010 diff hist +107 Electron Detector →Standard Running Procedure
- 08:22, 7 December 2010 diff hist +380 Electron Detector →Standard Running Procedure
- 06:09, 7 December 2010 diff hist +341 Electron Detector →Standard Running Procedure
- 20:13, 2 December 2010 diff hist 0 Electron Detector →upcoming beam-time (slot-1)
- 06:15, 30 November 2010 diff hist 0 File:EDet motion controller current.txt uploaded a new version of "Image:EDet motion controller current.txt" current
- 06:12, 30 November 2010 diff hist 0 File:EDet motion controller current.txt uploaded a new version of "Image:EDet motion controller current.txt": this has added incremental motion capability of upto 200 micron motion
- 06:10, 30 November 2010 diff hist -1 E-Detector Motion System →Controller Settings
- 06:08, 30 November 2010 diff hist 0 File:Edet motion controller settings.txt uploaded a new version of "Image:Edet motion controller settings.txt": this file is being moved from 'most recent' to 'last being used' on due to the further addition of new smaller increment motion that has been added to a new version current
- 06:01, 30 November 2010 diff hist +398 E-Detector Motion System →Controller Settings
- 08:33, 28 November 2010 diff hist +27 Electron Detector →beam-time (slot-2)
- 07:21, 28 November 2010 diff hist +713 Electron Detector →upcoming beam-time (slot-1)
- 01:30, 27 November 2010 diff hist -32 Electron Detector →upcoming beam-time (slot-1)
- 03:09, 26 November 2010 diff hist +2,229 Electron Detector
- 01:39, 26 November 2010 diff hist -26 Electron Detector →Standard Running Procedure
- 01:33, 26 November 2010 diff hist -2 Electron Detector →Standard Running Procedure
- 14:10, 24 November 2010 diff hist 0 E-Detector Assembly current
- 14:08, 24 November 2010 diff hist 0 File:Survey view dimensions.png uploaded a new version of "Image:Survey view dimensions.png": This is updated with information from both the pre and post installation survey details current
- 14:05, 24 November 2010 diff hist +107 N File:Survey view dimensions.png updated the picture to include the information from both the pre-installation and post-installation survey.
- 19:06, 19 November 2010 diff hist +39 Electron Detector →Upcoming
- 18:57, 19 November 2010 diff hist +508 Electron Detector →Standard Running Procedure
- 16:23, 19 November 2010 diff hist +1,173 Electron Detector
- 05:15, 19 November 2010 diff hist +658 Electron Detector →Current Run Plan
- 03:52, 19 November 2010 diff hist +261 Electron Detector →Standard Running Procedure
- 03:40, 19 November 2010 diff hist +81 Electron Detector →Request beam to be set through the chicane and verify the same
- 03:10, 19 November 2010 diff hist +298 Electron Detector →Standard Running Procedure
- 03:03, 19 November 2010 diff hist +1,659 Electron Detector
- 00:19, 14 November 2010 diff hist +19 E-Detector Motion System →Controller Settings
- 00:12, 14 November 2010 diff hist 0 File:EDet motion controller current.txt uploaded a new version of "Image:EDet motion controller current.txt": We added 4 jog functions that will cause the e-detector to jog in either direction by 1 or 2 mm based on the program called
- 23:29, 13 November 2010 diff hist +298 E-Detector Assembly
- 23:20, 13 November 2010 diff hist +83 N File:Survey view dimensions.JPG the dimensions in mm of the electron detector assembly as given to us as of Sept 09 current
- 20:02, 11 November 2010 diff hist +162 E-Detector Assembly
- 20:01, 11 November 2010 diff hist +82 N File:Edet Strip chart beamright.JPG This elaborates the electron detector strip mapping with the QWAD channel numbers. current
- 13:46, 11 November 2010 diff hist +84 E-Detector Assembly
- 13:42, 11 November 2010 diff hist +80 N File:Strip chart.JPG This elaborates the connection between the detector strips and the QWAD channels current
- 21:51, 10 November 2010 diff hist +6 m Nomenclature Conventions →Signal names
- 20:07, 10 November 2010 diff hist +1,471 Nomenclature Conventions
- 12:13, 10 November 2010 diff hist +249 Diamond strip electron detector
- 12:12, 10 November 2010 diff hist +49 N File:EDet front schematic.JPG This shows the technical details of the edetector current
- 12:04, 10 November 2010 diff hist +143 Nomenclature Conventions
- 12:02, 10 November 2010 diff hist 0 File:Edet terminology.JPG uploaded a new version of "Image:Edet terminology.JPG": trivial: MS warning underline removed from image current
- 11:59, 10 November 2010 diff hist 0 File:Edet terminology.JPG uploaded a new version of "Image:Edet terminology.JPG": trivial MS word warning underline removed
- 11:56, 10 November 2010 diff hist +67 N File:Edet terminology.JPG This elaborates the terminology used while in the electron detector
- 01:51, 5 November 2010 diff hist 0 File:Edet trig formation.png uploaded a new version of "Image:Edet trig formation.png": trivial change in background current
- 15:42, 4 November 2010 diff hist +1,128 Low Voltage Power supply for QWAD current
- 00:01, 23 October 2010 diff hist +57 Main Page
- 23:15, 22 October 2010 diff hist -37 m Electron Detector DAQ →Trigger Formation
- 23:15, 22 October 2010 diff hist 0 Electron Detector DAQ →Trigger Formation
- 23:14, 22 October 2010 diff hist +374 Electron Detector DAQ →Trigger Formation
- 23:00, 22 October 2010 diff hist +1,237 Electron Detector DAQ
- 21:41, 22 October 2010 diff hist +97 N File:Edet trig formation.png This diagram shows a compact schematic of how the trigger is formed in the electron detector DAQ.