Moller Polarimeter/A1n/d2n
From PolWiki
Jump to navigationJump to search
Moller measurement summaries for A1n/d2n
This is the "Cliff notes section on Moller polarimetry runs during the Polarized Helium-3 Running.
May 10, 2012 Position scan. HV increased for the left detector between run 1890 and 1891. hclog runlist initial measurement HV hclog
Table of good Moller runs
This will be a log of all "good" Moller runs; ie, our "production" runs. It will include some detailed notes when necessary.
Date Run Pol (%) Error (%) Hwien HW RHWP Energy(MeV) Comment 11/30/11 1266 87.07 0.51 0 0 6479 1157.17 Production IHWP IN 1267 87.44 0.71 0 0 6479 1157.25 Production IHWP IN 1268 87.60 0.68 0 0 6479 1157.28 Production IHWP IN 1269 -87.33 0.67 0 1 350 1157.03 Production IHWP OUT 1270 -88.14 0.70 0 1 350 1157.18 Production IHWP OUT 1271 -87.63 0.70 0 1 350 1157.17 Production IHWP OUT