Compton Meeting, August 4, 2011

From PolWiki
Revision as of 07:26, 4 August 2011 by Narayan (talk | contribs) (→‎Agenda)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Agenda

10 am Room F227

Laser

  1. Transfer function update, short term plan

Photon Detector

  1. LED system
  2. cooling system

Electron Detector

  1. Detector, QWAD update
  2. Analysis updates
  3. e-detector motion Encoder status

Analysis

  1. BPM/V2F issue

Simulation

...

Miscellaneous

  1. Where do we stand on our Summer down plan ?
  2. We need (at least) 4 more cables pulled between CH patch panel and tunnel