Agenda

Laser

  1. Cavity upgrade progress

Photon Detector

  1. LED system
  2. Cooling system update

Electron Detector

  1. Analysis update - dependence on dipole B-field knowledge
  2. QWAD work
  3. Installation progress

DAQ

  1. BPM/V2F issue: Might be the snake head. After putting a DAC that changes voltage every 1000 helicity windows, the 3P02A Y- remains unchanged.

Simulation

  1. There is no end in sight to Dave's procrastination

Miscellaneous

  1. New cables pulled - (still) not terminated

Other stuff

  1. Dave G. out of town next week - you're on your own.