Off-line analysis
From PolWiki
Revision as of 00:52, 3 March 2012 by Narayan (talk | contribs) (→List of changes in Run parameter)
List of changes in Run parameter
Run number range : Event
- 23211 ... : accumulation trigger changed from 2-plane to 3-plane
- : kept running with 3-plane accum trigger, all planes unmasked
- 23677 - 23765 : the laser cycle On:Off period was changed from regular 60:30 to 50:25
- 23766 - 23773 : beam off, calib input runs
- 23774 - 23835 : beam off, (LED linearity tests, DAQ tests etc)
- 23836 - 23913 : transverse regular running
- 23914 - 23926 : transverse running, I=75, edet trigger Gatewidth scan
- 23933 ... : regular longitudinal running , I = 180uA
- 23939 - 23945 : edet trigger gatewidth scan with changing trigger and mask conditions
- 23946 ... : back to 3-plane trigger, all planes including sick channels of plane-4 unmasked
- 24141 ... : changed slave firmware to 0x321B, master board firmware to 0xAA0D, has data for two PWTLs but 2nd one not working yet
- 24175 ... : masked off plane 2: strip 10 & 41; plane 3: strip 62