Minutes Hall C Meeting 2/18/2013

  • Walter Kellner
    • The concrete base has been removed.
    • Thurs Lockwood is coming to work on raising the back of SOS and removing bogies.
    • Next Mon Lockwood brings the jacking towers for removing SOS base frame.
    • Tech helping with superconducting cable search though the containers.
    • Need to identify which cables of the ones brought to the floor that need to be kept.
  • Joe Beaufait
    • HMS reroute almost done.
    • Started to disconnect G0 patch panel for move.
  • Mike Fowler
    • Grout pump arrives Tues. Meeting with contractor and safety to review grouting process.
    • Grouting should start Wed.