Uploads by Dien

From HallCWiki
Jump to navigationJump to search

This special page shows all uploaded files.

File list
Date Name Thumbnail Size Description Versions
10:51, 22 February 2022 CAFE new run plan REPORT 02182022 update.pdf (file) 1.87 MB - reoptimize the CaFe to determine the kinematic with 10.6 GeV beam and 8.55 Pe (for the optic matrix) - Doing rate estimation for MF and SRC for optimized kin - Apply Em < 50 MeV in this round to cut off the RC tail when we do rate estimation. 1
09:17, 1 March 2022 CaFe run plan 02232022.pdf (file) 162 KB Different run plans base on different condition (Iron target thickness and max beam current) 1
07:43, 20 June 2022 CaFe run 05182022.pdf (file) 198 KB The final production run plan using the most updated target information from Meekin in which we use 3% RL of Fe target and maximum current is 80 uA 1
10:34, 1 July 2022 CAFE rate AND run plan 07012022.pdf (file) 2.1 MB Put everything together (Optimization summary + Rate calculation for SRC and MF + Run plan) 1