Uploads by Dien
From HallCWiki
Jump to navigationJump to searchThis special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
10:51, 22 February 2022 | CAFE new run plan REPORT 02182022 update.pdf (file) | 1.87 MB | - reoptimize the CaFe to determine the kinematic with 10.6 GeV beam and 8.55 Pe (for the optic matrix) - Doing rate estimation for MF and SRC for optimized kin - Apply Em < 50 MeV in this round to cut off the RC tail when we do rate estimation. | 1 | |
09:17, 1 March 2022 | CaFe run plan 02232022.pdf (file) | 162 KB | Different run plans base on different condition (Iron target thickness and max beam current) | 1 | |
07:43, 20 June 2022 | CaFe run 05182022.pdf (file) | 198 KB | The final production run plan using the most updated target information from Meekin in which we use 3% RL of Fe target and maximum current is 80 uA | 1 | |
10:34, 1 July 2022 | CAFE rate AND run plan 07012022.pdf (file) | 2.1 MB | Put everything together (Optimization summary + Rate calculation for SRC and MF + Run plan) | 1 |