Difference between revisions of "Management/software"
From HallCWiki
Jump to navigationJump to searchLine 13: | Line 13: | ||
* Current working drafts of morning and afternoon talks and backup material for June 2012 software review. | * Current working drafts of morning and afternoon talks and backup material for June 2012 software review. | ||
** [[https://userweb.jlab.org/~saw/software/HallC_softreview_am.pptx Morning Session]] (May 3, 2012: Added a copy of the charge for reference.) | ** [[https://userweb.jlab.org/~saw/software/HallC_softreview_am.pptx Morning Session]] (May 3, 2012: Added a copy of the charge for reference.) | ||
− | ** [[https://userweb.jlab.org/~saw/software/ | + | ** [[https://userweb.jlab.org/~saw/software/HallC_softreview_pm_jra120509.pptx Afternoon Session]] With SIMC material from JRA added. |
** [[https://userweb.jlab.org/~saw/software/simc_overview.pptx SIMC overview - Possible backup material]] | ** [[https://userweb.jlab.org/~saw/software/simc_overview.pptx SIMC overview - Possible backup material]] | ||
− | + | *All hall [[https://halldweb1.jlab.org/wiki/index.php/2012_Software_Review Documents ]] for planning for a JLab software readiness review | |
− | *All hall [[https://halldweb1.jlab.org/wiki/index.php/2012_Software_Review Documents ]] for planning for a JLab software readiness review |
Revision as of 08:32, 10 May 2012
12 GeV software review
- Email from Rolf on the dry runs
First dry runs for the software review talks are scheduled for Monday May 14th from 1 pm to 5 pm in F326/7. As float we have the next day, Tuesday from 3:30 pm on, at the same location. The main idea of these dry runs is to have presentations near-complete such that we can bounce ideas off each other, find omissions, make improvements. There do not have to be stand-uop presentations, mainly flipping through the various slides.
- Charge of the committee.
- Agenda of meeting on June 7 and 8th.
- Current working drafts of morning and afternoon talks and backup material for June 2012 software review.
- [Morning Session] (May 3, 2012: Added a copy of the charge for reference.)
- [Afternoon Session] With SIMC material from JRA added.
- [SIMC overview - Possible backup material]
- All hall [Documents ] for planning for a JLab software readiness review