Difference between revisions of "RC Meeting and Run Plan, Thursday, February 8"

From HallCWiki
Jump to: navigation, search
(Created page with "{{Template:J/psi-007 Experiment Navigation With Logo}} = RC Meeting Information = <b> RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room </b> * Bluejea...")
 
(Current Status)
 
(One intermediate revision by the same user not shown)
Line 28: Line 28:
 
= Current Status =
 
= Current Status =
  
* Hall is in power permit as of 15:01
+
* Hall C got "beam authorization" at 16:01: https://logbooks.jlab.org/entry/3649097
 
+
* still need the "beam authorization" for C (according to the crew chief work in building 95 has been completed: https://logbooks.jlab.org/entry/3648962)
+
  
 
* LH2 target is ready; TO's are watching it
 
* LH2 target is ready; TO's are watching it

Latest revision as of 17:07, 8 February 2019

Main | Online | RC | Run Plan | Official Website | Redmine | Index | Nav
Jpsi007.png

RC Meeting Information

RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

Current Status

  • LH2 target is ready; TO's are watching it
  • target is now in home and so is the radiator (radiator is out of beam)
  • The DAQ has been switched by Sylvester to COIN mode and we took a cosmic run after, it looks good; we are currently taking a run triggering on cosmics and 10 Hz from pulser
  • monitoring histograms for detectors look O.K.
  • the HMS shutter issue has been addressed; shutter is now open in preparation for beam (huts doors are closed)

Current Run Plan

  • Run plan posted here: [1]

Notices in Effect for Shift Crew

  • Read this about the radiator: [2]

Current Issues

  • no issues in Hall C

Planned Accesses to the Hall

Planned Accelerator Configuration Changes

Special Requests