Difference between revisions of "Testing SHMS Preshower"
From HallCWiki
Jump to navigationJump to searchLine 6: | Line 6: | ||
* Computer is called ''cnu''. The account is gep5. | * Computer is called ''cnu''. The account is gep5. | ||
== HV Setup == | == HV Setup == | ||
− | * Can control the CAEN 403 through terminal on '' | + | * Can control the CAEN 403 through terminal on ''cnu''. |
− | [https://hallcweb.jlab.org/wiki/images/ | + | [https://hallcweb.jlab.org/wiki/images/0/0f/Calorimeter_specs.pdf Preshower HV cabling map] |
Revision as of 14:36, 28 June 2012
Status
- The preshower has been cabled with signal and HV.
- Have checked setting each channel to 1400V that signal is seen.
Computer Setup
- Computer is called cnu. The account is gep5.
HV Setup
- Can control the CAEN 403 through terminal on cnu.