Difference between revisions of "Testing SHMS Preshower"
From HallCWiki
Jump to navigationJump to search (→Status) |
|||
Line 1: | Line 1: | ||
[[Category:SHMSinfo]] | [[Category:SHMSinfo]] | ||
== Status == | == Status == | ||
− | * The | + | * The SHMS Calorimeter has been cabled with signal and HV. |
* Have checked setting each channel to 1400V that signal is seen. | * Have checked setting each channel to 1400V that signal is seen. | ||
+ | * Altered within SHMS to match around 50 mV | ||
+ | *Added external PMT's across top of calorimeter, 6 in total, | ||
*06/28 Taking data for number of events through calorimeter and external PMT's | *06/28 Taking data for number of events through calorimeter and external PMT's | ||
Revision as of 14:55, 28 June 2012
Status
- The SHMS Calorimeter has been cabled with signal and HV.
- Have checked setting each channel to 1400V that signal is seen.
- Altered within SHMS to match around 50 mV
- Added external PMT's across top of calorimeter, 6 in total,
- 06/28 Taking data for number of events through calorimeter and external PMT's
Computer Setup
- Computer is called cnu. The account is gep5.
HV Setup
- Can control the CAEN 403 through terminal on cnu.
- Open terminal
- type "su" to login as superuser.
- type "minicom"
- Preshower HV cabling map