= Current Status =
 
= Current Status =
*
+
* No new major issues over the last 24 hours.
  
 
= Current Run Plan =
 
= Current Run Plan =
*
+
* Continue running kinematics 2 through the night.
 +
*  Switch to kinematics 3 around 9am Friday morning.
  
 
= Notices in Effect for Shift Crew =
 
= Notices in Effect for Shift Crew =
*
+
*'''Shift Leader''' is responsible for 50k replays. Even if the TO is actually doing them.
 +
*Missing Reference Times during the replay: check in the 50k. Check in full replay, if able. If it happens, call RC. Guidance to solve it is here: [https://logbooks.jlab.org/entry/3654584 https://logbooks.jlab.org/entry/3654584]
  
 
= Current Issues =
 
= Current Issues =
*
+
* No new issues since yesterday.
 +
Recently resolved Issues:
 +
*  [https://logbooks.jlab.org/entry/3661148 Beam Right "Waterfall" camera works again] after Dave Gaskell upgraded the firmware.
 +
Unresolved Issues:
 +
* [https://logbooks.jlab.org/entry/3660342 Rotation controller needs rebooted]. Will require access.
 +
* [https://logbooks.jlab.org/entry/3660401 HMS Q3 current readback errors]. Alarm silenced. Will require hall access to power cycle.
 +
* [https://logbooks.jlab.org/entry/3660076 HMS Q1 and Q3 PSU M-panel (local front panels) are showing signs of failure]. No action taken. Might be fixed with Q3 current readback error above.
 +
* Ethan installed a current limitation board on the HMS Q2 spare PSU. Currently it is set to ~700A. Needs to be increased for CSV.
  
 
= Planned Accesses to the Hall =
 
= Planned Accesses to the Hall =
*
+
* In order to rotate the spectrometers and change central momenta we will need access to the hall.  Whether we need a longer access with survey/sweep or a short escorted access depends on if we want to do anything else while we are down.  Changing the Cherenkov pressure is one task would could do with a longer access (~1 hour).  Steve should be able to rotate and set magnet currents in a short access.  This should be decided by the end of this meeting, so we can inform the relevant parties.
  
 
= Planned Accelerator Configuration Changes =
 
= Planned Accelerator Configuration Changes =

Latest revision as of 16:28, 28 February 2019

Main | Online | RC | Run Plan | Official Website | Redmine | Index | Nav
Jpsi007.png

RC Meeting Information

RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

Current Status

  • No new major issues over the last 24 hours.

Current Run Plan

  • Continue running kinematics 2 through the night.
  • Switch to kinematics 3 around 9am Friday morning.

Notices in Effect for Shift Crew

  • Shift Leader is responsible for 50k replays. Even if the TO is actually doing them.
  • Missing Reference Times during the replay: check in the 50k. Check in full replay, if able. If it happens, call RC. Guidance to solve it is here: https://logbooks.jlab.org/entry/3654584

Current Issues

  • No new issues since yesterday.

Recently resolved Issues:

Unresolved Issues:

Planned Accesses to the Hall

  • In order to rotate the spectrometers and change central momenta we will need access to the hall. Whether we need a longer access with survey/sweep or a short escorted access depends on if we want to do anything else while we are down. Changing the Cherenkov pressure is one task would could do with a longer access (~1 hour). Steve should be able to rotate and set magnet currents in a short access. This should be decided by the end of this meeting, so we can inform the relevant parties.

Planned Accelerator Configuration Changes

Special Requests