== Moller Measurement ==
  - Will need 8 hours to perform one Moller measurement.
+
   - Plan: we will perform Moller measurements twice a week to start with. If the polarization is stable we can do this once a week, and after each accelerator (shut)down time or beam condition change.
   - Plan: we will perform one Moller measurement two weeks and after each accelerator (shut)down time or beam condition change.
+
  - Each Moller measurement takes about 8 hours and must be done during daytime on a weekday (to allow expert support).
   - Note: may want to save this for after polarized cell change.
+
   - Note: this is a nice "time filler" to use after changing the polarized 3He cell.  
 
    
 
    
 
   '''Procedure'''
 
   '''Procedure'''

Revision as of 14:10, 14 January 2020

Overview

For polarized 3He running in Fall 2019 and Spring 2020, the nominal raster for production is 5mm diameter circular. The nominal triggers used are 3/4 for both HMS and SHMS. Both HMS and SHMS should be taking data (for example if run plan specify one run, it means one run on HMS and one run on SHMS simultaneously). No coincidence trigger will be used/setup.

For 5-pass production of A1n at large angle, there are two settings each for HMS (3,4) and SHMS (B,C). For each setting, we will take data on polarized 3He cell, a few hours on reference cell (both N2 and 3He), and need 1 hour of positive polarity runs on SHMS per setting.

For 5-pass production of A1n at large angle, we will also need 8 hours of optics data. May want to save this for when cell change is needed.

For 5-pass production of A1n at small angle, there are two settings for HMS (1,2) and one for SHMS (D). For each setting, we will take data on polarized 3He cell, a few hours on reference cell (both N2 and 3He). No positive polarity runs will be needed.

We will need Moller measurements throughout the production running, preferrably every two weeks and after each accelerator condition change. May want to save this for when cell change is needed.

Polarized_Helium-3_Experiments#Run_Plan <- click this to return to main run plan page

Beam and raster checkout

 Please refer to Beam and Raster Checkout for A1n/d2n (Short Procedure).
 Or Beam and Raster Checkout for A1n/d2n (Long Procedure).

Moller Measurement

 - Plan: we will perform Moller measurements twice a week to start with. If the polarization is stable we can do this once a week, and after each accelerator (shut)down time or beam condition change.
 - Each Moller measurement takes about 8 hours and must be done during daytime on a weekday (to allow expert support).
 - Note: this is a nice "time filler" to use after changing the polarized 3He cell. 
 
 Procedure
 - Ask Dave Gaskell to work his magic.

Beam Energy Measurement

 - RC should contact MCC to organize a beam energy measurement during 5-pass running. We will do it once, and after each major accelerator configuration change.
 - Time: 1 hour

Rate study with 3He Reference Cell

 Goals 
 - To have a quick survey of production rates at each kinematics. Data will also be used to determine/cross check 3He cross sections.
 Setup
 - Beam Current: 30uA, raster always ON (5mm diameter)
 - Beam IHWP:    do not care
 - Target:       Reference cell filled with 3He, OR Polarized 3He Cell
 - Detectors:    All scintillator bars ON. 
 
 Procedure
 - Set HMS:  30 deg, -3.5 GeV/c (kine 4)
 - Set SHMS: 30 deg, -3.4 GeV/c (kine B) 
 - Set target at Reference Cell position, note type of gas and write down pressure reading in the Start-of-Run comment. Or move target to Polarized 3He Cell position.
 - Check and make sure all scintillator HVs are ON (both HMS and SHMS).
 - Ask for 30uA raster ON, use 3/4 triggers only, check rates and set prescale factors (for 30 deg we should not need to prescale at all). 
 - Take one 60-min runs at this setting, then change to next setup:
 - Set HMS:  30 deg, -2.9 GeV/c (kine 3)
 - Set SHMS: 30 deg, -2.4 GeV/c (kine C) 
 - Ask for 30uA raster ON, use 3/4 triggers only, check rates and set prescale factors (for 30 deg we should not need to prescale at all). 
 - Take one 60-min runs at this setting.

Positron Rate with SHMS

 Goal 
 - To determine pair production background, and to determine its asymmetry.
 Setup
 - Beam Current: 30uA, raster always ON (5mm diameter)
 - Target:       Polarized 3He Cell or Reference cell filled with 3He
 - Spectrometer: SHMS positive polarity (HMS can continue taking regular production data).
 
 Spectrometer Setup
 - SHMS positive polarity
 Procedure
 - Set target at Reference Cell position, note type of gas and write down pressure reading in the Start-of-Run comment. Or
 - Set target at Polarized 3He Cell position.
 - Check and make sure all scintillator HVs are ON (both HMS and SHMS).
 - Set SHMS: 30 deg, +3.4 GeV/c (kine B) 
 - Ask for 30uA raster ON, use 3/4 triggers only, check rates and set prescale factors (for 30 deg we should not need to prescale at all). 
 - Take seven 60-min runs at this setting, then change to Setup 2:
 
 - Set SHMS: 30 deg, +2.4 GeV/c (kine C) 
 - Ask for 30uA raster ON, use 3/4 triggers only, check rates and set prescale factors (for 30 deg we should not need to prescale at all). 
 - Take thirteen 60-min runs at this setting.
 - At the end of data taking, reverse polarity of all SHMS magnets and continue with production run (regular, electron polarity).

Production Running (Polarized 3He Asymmetries)

 Goals 
 - To determine physics asymmetry of 3He at high x -- This is what we are approved beam time for!
 Setup
 - Beam Current: 30uA, raster always ON (5mm diameter)
 - Beam IHWP:    flip roughly daily
 - Target:       Polarized 3He Cell
 - Detectors:    All scintillator bars ON. 
 
 Spectrometer Setup 1
 - HMS setting:  30 deg, -3.5 GeV/c (kine 4)
 - SHMS setting: 30 deg, -3.4 GeV/c (kine B) 
 Procedure
 - Set target at Reference Cell position, note type of gas and write down pressure reading in the Start-of-Run comment.
 - Check and make sure all scintillator HVs are ON (both HMS and SHMS).
 - Ask for 30uA raster ON, use 3/4 triggers only, check rates and set prescale factors (for 30 deg we should not need to prescale at all). 
 - Take one 60-min runs at this setting, then change to Setup 2:
 
 Spectrometer Setup 2
 - HMS setting:  30 deg, -2.9 GeV/c (kine 3)
 - SHMS setting: 30 deg, -2.4 GeV/c (kine C) 
 - Ask for 30uA raster ON, use 3/4 triggers only, check rates and set prescale factors (for 30 deg we should not need to prescale at all). 
 - Take one 60-min runs at this setting.

Production Running (Reference Cell Runs)

 - For planning purposes it is useful to list all reference cell runs here.  The following proposed times are from the 2010 proposal. Time listed are in calendar hours (twice the PAC hour in the proposal. That is, "BEAM ON" time should be half the values below).
 - Analysis requirement are the same as polarized 3He target data.
 - N2 Reference Cell runs to check the dilution factor for each kinematics. Need 8-10atm N2 Reference Cell.
 - 4 hours at HMS Kine 1 (12.5 deg, -5.7 GeV)
 - 4 hours at HMS Kine 2 (12.5 deg, -6.8 GeV)
 - 8 hours at HMS kine 3 (30 deg, -2.9 GeV)
 - 8 hours at HMS Kine 4 (30 deg, -3.5 GeV)
 - 8 hours at SHMS Kine B (30 deg, -3.4 GeV)
 - 8 hours at SHMS Kine C (30 deg, -2.4 GeV)
 - 4 hours at SHMS Kine D (12.5 deg, -7.5 GeV)
 - Positron runs to check e+/e- background. Need 8-10atm 3He Reference Cell.
 - Possibly using 3He Reference Cell will be good enough. Depending on how difficult it is to change polarity, we need only positron runs on SHMS (HMS is optional)
 - 2 hour at SHMS Kine B (and HMS Kine 4)
 - 2 hour at SHMS Kine C (and HMS Kine 3)

Production Running (Polarized 3He Runs)

Online/Expert Analysis Requirement

 Things to Watch For in Online Analysis
 - Check PID, we need only electrons. Pion backgrounds may be high.
 - Check ztar distribution to check if cuts are necessary to reject glass windows. Electron yield should be extracted for 3He gas only.
 - Asymmetry will flip sign for each target spin and beam IHWP reversal.
 - Please extract yield per charge, helicity-dependent charge Q+ Q- and yield N+ N- cumulated over this kinematics.
 - Please use the following xbj bins, extract N+ N- and yield per charge N+/Q+ N-/Q- cumulated over this kinematics, and calculate asymmetries for N/Q.
 - xbj bin centers: 0.25, 0.30, 0.35, 0.40, 0.45, 0.50, 0.55, 0.60, 0.65, 0.71,0.77,0.83,0.89,0.95,1.00
 - xbj bin widths:  0.025,0.025,0.025,0.025,0.025,0.025,0.025,0.025,0.025,0.03,0.03,0.03,0.03,0.03,0.03
 - Please post W and Xbj distributions, cumulated N+ N-, x-binned cumulated N+ N-, x-binned cumulated asymmetries per day.

Polarized Beam and Polarized 3He Target Requirements

 - Beam IHWP and Target Spin should be flipped half way for each data set, forming equal data collection for: IN/0, IN/180, OUT/0, OUT/180 for longitudinal target settings and equal data collection for: IN/90, IN/270, OUT/90, OUT/270 for transverse target settings.
 - Propose flipping Beam IHWP once a day.
 - Frequency of target spin flip depends on how easy it is, and can vary from once a day to once in a while. One of the target experts must be present for this step.
 - 
 - during typically data taking, need full target polarimetry (EPR, NMR, pNMR if possible) once per shift, and NMR (or pulsed NMR) every 2 hours, or less often if AFP loss is high.

Production Large Angle (30-degree) High Momentum Running (Kine 4,B)

 Overview 
 - We will run 42.5 (40 now?) calendar days with SHMS Kine B/HMS Kine 4;
 - Beam IHWP and Target Spin should be flipped routinely, providing same statistics for ++, +-, -+ and -- configurations;
 - We will take 1 hour of Empty Cell runs. More may be needed.
 - We will take 4 hours of Reference Cell N2 runs at 8 atm;
 - We will take 4 hours of data with SHMS at positive polarity (should be combined with positive polarity kine C below);
 Setup
 - Beam Current: 30uA, raster always ON (5mm diameter)
 - Target:      Polarized 3He Cell, Reference Cell -- Empty, filled with N2, filled with 3He
 - Pol3He Target Spin: 82% of data at longitudinal (0 and 180 deg), 18% at transverse (90 and 270 deg) spin;
 - HMS (Kine 4):  30.0 deg, 3.5 GeV/c (electron)
 - SHMS (Kine B): 30.0 deg, 3.4 GeV/c (electron) except for positive polarity running
 - Detectors:  All SC bars ON
 Procedure
 - Expected 3He gas rate: 0.94 Hz (HMS), 1.57 Hz (SHMS);
 - Expected pi/e ratio: (2-5):1 for the worst xbj bin
 - Expected total electron counts (3He gas yield N+ plus N-): 1.7M (HMS), 2.9M(SHMS)

Production Large Angle (30-degree) Low Momentum Running (Kine 3,C)

 Overview 
 - We will run 7.3 (6 now?) days at SHMS Kine C/HMS Kine 3;
 - For this setting, 82% of data will be taken with longitudinal target spin, 18% at transverse target spin;
 - Beam IHWP and Target Spin should be flipped routinely, providing same statistics for ++, +-, -+ and -- configurations;
 - We will take 1 hour of Empty Cell runs. More may be needed.
 - We will take 4 hours of Reference Cell N2 runs at 8 atm;
 - We will take 4 hours of data with SHMS at positive polarity (should be combined with positive polarity kine B above);
 Setup
 - Beam Current: 30uA, raster always ON (5mm diameter)
 - Target:      Polarized 3He Cell, Reference Cell -- Empty, filled with N2, filled with 3He
 - HMS (Kine 3):  30.0 deg, 2.9 GeV/c (electron)
 - SHMS (Kine C): 30.0 deg, 2.4 GeV/c (electron) except for positive polarity running
 - Detectors:  All SC bars ON
 Procedure
 - Expected 3He gas rate: 3.4Hz (HMS), 8.2Hz (SHMS)
 - Expected pi/e ratio: up to 40/1 for the worst xbj bin
 - Expected total electron counts (3He gas yield N+ plus N-): 1M (HMS), 2.6M (SHMS)

Production Small angle (12.5 deg) HMS Low Momentum (HMS Kine 1)

 Overview 
 - We will run 2 days plus two shifts at HMS Kine 1;
 - Beam IHWP and Target Spin should be flipped routinely, providing same statistics for ++, +-, -+ and -- configurations;
 - We will take 1 hour of Empty Cell runs. 
 - We will take 2 hours of Reference Cell N2 runs at 8 atm;
 Setup
 - Beam Current: 30uA, raster always ON (5mm diameter)
 - Target:      Polarized 3He Cell, Reference Cell -- Empty, filled with N2, filled with 3He
 - Pol3He Target Spin: 75% of data at longitudinal (0 and 180 deg), 25% at transverse (90 and 270 deg) spin;
 - HMS:  12.5 deg, 5.7 GeV/c (electron)
 - SHMS: should be at kine D (see below)
 - Detectors:  All SC bars ON
 Procedure
 - Expected 3He gas rate: 880Hz
 - Expected pi/e ratio: less than 1/1
 - Expected total electron counts (3He gas yield N+ plus N-): 101M

Production Small angle (12.5 deg) HMS Low Momentum (HMS Kine 2)

 Overview 
 - We will run 5 days plus one shift at HMS Kine 2;
 - Beam IHWP and Target Spin should be flipped routinely, providing same statistics for ++, +-, -+ and -- configurations;
 - We will take 1 hour of Empty Cell runs. 
 - We will take 2 hours of Reference Cell N2 runs at 8 atm;
 Setup
 - Beam Current: 30uA, raster always ON (5mm diameter)
 - Target:      Polarized 3He Cell, Reference Cell -- Empty, filled with N2, filled with 3He
 - Pol3He Target Spin: 72% of data at longitudinal (0 and 180 deg), 28% at transverse (90 and 270 deg) spin;
 - HMS:  12.5 deg, 6.8 GeV/c (electron)
 - SHMS: should be at kine D (see below)
 - Detectors:  All SC bars ON
 Procedure
 - Expected 3He gas rate: 500Hz
 - Expected pi/e ratio: low (<1/1)
 - Expected total electron counts (3He gas yield N+ plus N-): 115M

Production Small angle (12.5 deg) SHMS Resonance (SHMS Kine D)

 Overview 
 - We will run 8 days at SHMS Kine D;
 - Beam IHWP and Target Spin should be flipped routinely, providing same statistics for ++, +-, -+ and -- configurations;
 - We will take 1 hour of Empty Cell runs. 
 - We will take 2 hours of Reference Cell N2 runs at 8 atm;
 Setup
 - Beam Current: 30uA, raster always ON (5mm diameter)
 - Target:      Polarized 3He Cell, Reference Cell -- Empty, filled with N2, filled with 3He
 - Since this setting is concurrent with HMS Kine 1 and 2, target spin should follow instructions for HMS Kine 1 and 2 above.
 - SHMS: 12.5 deg, 7.5 GeV/c (electron)
 - Detectors:  All SC bars ON
 Procedure
 - Expected 3He gas rate: 185Hz
 - Expected pi/e ratio: very low
 - Expected total electron counts (3He gas yield N+ plus N-): 64M