Difference between revisions of "Dutch → Big Brother target change"

From HallCWiki
Jump to navigationJump to search
Line 9: Line 9:
 
B) 9:30:Open target enclosure (4 plastic panels): 3 or 4 Hall C Techs+ RadCon+Jian-Ping
 
B) 9:30:Open target enclosure (4 plastic panels): 3 or 4 Hall C Techs+ RadCon+Jian-Ping
  
C) 10:30 Remove Dutch and the target ladder: Arun, Todd, Jian-Ping, one target student+Radcon (1 or 2)
+
C1) 10:30: EPR calibration in both longitudinal  and transverse: Jian-Ping+EPR expert(s)+RadCon
 +
 
 +
C2) 11:30 Remove Dutch and the target ladder: Arun, Todd, Jian-Ping, one target student+Radcon (1 or 2)
  
 
<font color="red">
 
<font color="red">
D) 12:00 Put Hall in Last Controlled Access: Jian-Ping
+
D) 13:00 Put Hall in Last Controlled Access: Jian-Ping
  
E) 12:10 Laser polarization measurement: Junhao,Todd+Radcon
+
E) 13:10 Laser polarization measurement: Junhao,Todd+Radcon
  
F) 12:10 Out of Last Controlled Access: Jian-Ping
+
F) 13:10 Out of Last Controlled Access: Jian-Ping
 
</font>
 
</font>
  
G) 14:00 Replace EPR fiber bundle: 1 target expert+Jian-Ping+RadCon
+
G) 15:00 Replace EPR fiber bundle: 1 target expert+Jian-Ping+RadCon
  
H) 15:00 Install Big Brother: Arun, Todd, Bill, Jian-Ping+RadCon
+
H) 16:00 Install Big Brother: Arun, Todd, Bill, Jian-Ping+RadCon
  
I) 16:00 Install target ladder/Ref. Cell connection: Arun, Todd, Bill, Jian-Ping+RadCon
+
I) 17:00 Install target ladder/Ref. Cell connection: Arun, Todd, Bill, Jian-Ping+RadCon
  
J) 17:00 Set-up RTDs and other connections: Arun, Bill, Jian-Ping+RadCon
+
J) 18:00 Set-up RTDs and other connections: Arun, Bill, Jian-Ping+RadCon
  
K) 18:00 Alignment check: Arun, Bill, Jian-Ping+RadCon
+
K) 19:00 Alignment check: Arun, Bill, Jian-Ping+RadCon
  
 
<font color="red">
 
<font color="red">
L) 20:00 Put Hall in Last Controlled Access: Jian-Ping
+
L) 21:00 Put Hall in Last Controlled Access: Jian-Ping
  
M) 20:00 Laser alignement/spot: Jian-Ping+Target experts+Radcon
+
M) 21:00 Laser alignement/spot: Jian-Ping+Target experts+Radcon
  
N) 22:00 Out of Last Controlled Access: Jian-Ping
+
N) 23:00 Out of Last Controlled Access: Jian-Ping
 
</font>
 
</font>
  
Oa) 22:00 put back the target enclosures, and close Hall for data taking overnight on ref. cell: 3 Techs+RadCon.
+
Oa) 23:00 put back the target enclosures, and close Hall for data taking overnight on ref. cell: 3 Techs+RadCon.
  
 
or
 
or
  
Ob) 22:00 Start polarizing the target for target check overnight
+
Ob) 23:00 Start polarizing the target for target check overnight
  
 
P) Tuesday 7:00am close the target if it had not been done. Then target polarimetry calibrations and tests.  
 
P) Tuesday 7:00am close the target if it had not been done. Then target polarimetry calibrations and tests.  

Revision as of 13:49, 7 February 2020

Plan for Dutch → Big Brother target change

Hall Status: Controlled Access, if possible. Red fonts show when the Hall will be in Laser Controlled Access.

Tentative plan

A) 8:30am: Polarized beam is terminated. Full Survey of the Hall (RadCon). Hall stays in Controlled Access.

B) 9:30:Open target enclosure (4 plastic panels): 3 or 4 Hall C Techs+ RadCon+Jian-Ping

C1) 10:30: EPR calibration in both longitudinal and transverse: Jian-Ping+EPR expert(s)+RadCon

C2) 11:30 Remove Dutch and the target ladder: Arun, Todd, Jian-Ping, one target student+Radcon (1 or 2)

D) 13:00 Put Hall in Last Controlled Access: Jian-Ping

E) 13:10 Laser polarization measurement: Junhao,Todd+Radcon

F) 13:10 Out of Last Controlled Access: Jian-Ping

G) 15:00 Replace EPR fiber bundle: 1 target expert+Jian-Ping+RadCon

H) 16:00 Install Big Brother: Arun, Todd, Bill, Jian-Ping+RadCon

I) 17:00 Install target ladder/Ref. Cell connection: Arun, Todd, Bill, Jian-Ping+RadCon

J) 18:00 Set-up RTDs and other connections: Arun, Bill, Jian-Ping+RadCon

K) 19:00 Alignment check: Arun, Bill, Jian-Ping+RadCon

L) 21:00 Put Hall in Last Controlled Access: Jian-Ping

M) 21:00 Laser alignement/spot: Jian-Ping+Target experts+Radcon

N) 23:00 Out of Last Controlled Access: Jian-Ping

Oa) 23:00 put back the target enclosures, and close Hall for data taking overnight on ref. cell: 3 Techs+RadCon.

or

Ob) 23:00 Start polarizing the target for target check overnight

P) Tuesday 7:00am close the target if it had not been done. Then target polarimetry calibrations and tests.

Q) Tuesday ??:??am/pm: Take unpolarized beam on Ref. cell until Wednesday 8:00am (a separate run plan is being prepared for this period.)

In parallel to the above, other tasks need to be done Monday. They should be organized when enough access keys are available (who is in the Hall will be written in the counting room white board).

a) Rotation stage/camera: Ethan (Jack), Brad

b) Kepco power supply swap/fix/work: Bill

c) Replace the 2 old flowmeters for the nitrogen cooling jets lines with 2 new ones: Andy (Jack)

List of relevant persons with contact email

  • RadCon:
    • Keith Welch <welch@jlab.org>,
    • David Hamlette <hamlette@jlab.org>;
  • Hall leadership:
    • Cynthia (Thia) Keppel <keppel@jlab.org>;
    • Stephen Wood <saw@jlab.org>;
  • Work Coordinator: Walter Kellner <kellner@jlab.org>;
  • Run Coordinator: Alexandre Deur <deurpam@jlab.org>
  • PDL: Greg Smith <smithg@jlab.org>;
  • Experiment/Target leadership:
    • Jian-Ping Chen <jpchen@jlab.org>;
    • Xiaochao Zheng <xiaochao@jlab.org>;
    • Averett, Todd D <tdaver@wm.edu>;
    • Brad Sawatzky <brads@jlab.org>;
  • Engineers/Technical
    • Jack Segal <segal@jlab.org>;
    • Steven Lassiter <lassiter@jlab.org>;
    • Ethan Becker <ethanb@jlab.org>;
    • Andrew Kenyon <kenyon@jlab.org>;
  • Target experts
    • Arun Tadepalli <arunts@jlab.org>;
    • William Henry <wmhenry@jlab.org>;
    • Melanie Rehfuss <mrehfuss@jlab.org>;
    • Mingyu Chen <mingyu@jlab.org>;
    • Junhao Chen <jhchen@jlab.org>;
    • Murchhana Roy <mroy@jlab.org>.