Difference between revisions of "Polarized He-3 Proposals"

From HallCWiki
Jump to: navigation, search
(E12-06-110 (A1n))
 
(6 intermediate revisions by 2 users not shown)
Line 5: Line 5:
 
* [https://userweb.jlab.org/~xiaochao/12gev/HALLC/PR12_a1n_hallc.pdf E12-06-110 (A1n) proposal for PAC30] - detailed physics motivation and rates/uncertainties assuming the 6 GeV polarized 3He target performance
 
* [https://userweb.jlab.org/~xiaochao/12gev/HALLC/PR12_a1n_hallc.pdf E12-06-110 (A1n) proposal for PAC30] - detailed physics motivation and rates/uncertainties assuming the 6 GeV polarized 3He target performance
 
* [https://userweb.jlab.org/~xiaochao/12gev/HALLC/2010/PR12_a1n_hallc_update2010.pdf E12-06-110 (A1n) Update for PAC36] - in this update we used the stage-II target upgrade performance - approved for 36 PAC days
 
* [https://userweb.jlab.org/~xiaochao/12gev/HALLC/2010/PR12_a1n_hallc_update2010.pdf E12-06-110 (A1n) Update for PAC36] - in this update we used the stage-II target upgrade performance - approved for 36 PAC days
* [https://hallcweb.jlab.org/experiments/A1n/docs/Update_a1n_hallc_Jan2018.pdf 2018 Update] -- in this update we summarize the rate and uncertainty estimation using the stage-I polarized 3He target and with the latest SHMS simulation, while keeping the total approved beam time unchanged.
+
* [https://hallcweb.jlab.org/experiments/A1n/docs/Update_a1n_hallc_Jan2018.pdf E12-06-110 (A1n) 2018 Update] - in this update we summarize the rate and uncertainty estimation using the stage-I polarized 3He target and with the latest HMS and SHMS simulations, while keeping the total approved beam time (36 PAC days) unchanged. Some of the kinematic settings have been modified to reflect the latest status of the HMS or SHMS.
  
 
=== E12-06-121 (d2n-g2n)===
 
=== E12-06-121 (d2n-g2n)===
 
* [[Media:PR12-06-121.pdf|E12-06-121 (d2n-g2n) Proposal for PAC30]]
 
* [[Media:PR12-06-121.pdf|E12-06-121 (d2n-g2n) Proposal for PAC30]]
* [[Media:d2n_HallC_PAC36-update_v2.pdf|E12-06-121 (d2n-g2n) Update for PAC36 (Grading PAC)]]
+
* [[Media:d2n_HallC_PAC36-update_v2.pdf|E12-06-121 (d2n-g2n) Update for PAC36 (Grading PAC)]] - Approved for 29 PAC days.  Updated to accommodate planned improvement in Target FoM.
 +
 
 +
=== E12-06-121A (Measurement of 3He Elastic Electromagnetic Form Factor Diffractive Minima Using Polarization Observables) ===
 +
* [[Pol_3He_Elastic_Measurement]]
 +
* 3He Form Factor Double-Polarization Asymmetry Measurement [[Media:PAC_Proposal_3He_Polarization_Observables.pdf | Proposal]]

Latest revision as of 17:28, 24 July 2020

E12-06-110 (A1n)

Measurement of the neutron spin asymmetry A1n in the valence quark region using a 11 GeV beam and a polarized 3He target in Hall C

  • E12-06-110 (A1n) proposal for PAC30 - detailed physics motivation and rates/uncertainties assuming the 6 GeV polarized 3He target performance
  • E12-06-110 (A1n) Update for PAC36 - in this update we used the stage-II target upgrade performance - approved for 36 PAC days
  • E12-06-110 (A1n) 2018 Update - in this update we summarize the rate and uncertainty estimation using the stage-I polarized 3He target and with the latest HMS and SHMS simulations, while keeping the total approved beam time (36 PAC days) unchanged. Some of the kinematic settings have been modified to reflect the latest status of the HMS or SHMS.

E12-06-121 (d2n-g2n)

E12-06-121A (Measurement of 3He Elastic Electromagnetic Form Factor Diffractive Minima Using Polarization Observables)