Difference between revisions of "Charge Feedback Parity DAQ"
From HallCWiki
Jump to navigationJump to searchLine 17: | Line 17: | ||
[[Image:parity-daq2.jpg|400px|System run via ssh tunneling in Feb 2020]] | [[Image:parity-daq2.jpg|400px|System run via ssh tunneling in Feb 2020]] | ||
− | === Useful Commands === | + | === Useful Commands (on cdaq machines) === |
* <code>go_parity</code> Injector parity settings (IHWP status, Hall Laser IA settings, etc) | * <code>go_parity</code> Injector parity settings (IHWP status, Hall Laser IA settings, etc) | ||
* <code>go_parity_feedback</code> Bring up the Parity DAQ charge feedback VNC session (if Hall C is running alone; see below) | * <code>go_parity_feedback</code> Bring up the Parity DAQ charge feedback VNC session (if Hall C is running alone; see below) |
Revision as of 12:22, 17 September 2020
The Charge Asymmetry Feedback system is controlled by the Hall A Parity DAQ.
When Hall A is in production mode, the Hall A shift crew will manage the Parity DAQ and control feedback for both Hall A and Hall C beams.
If the Hall A Counting House is not staffed, then Hall C must negotiate with the Parity group to ensure that the Parity DAQ is still running.
- This must be running for all 3He production data! (And should be running in general.)
- The state of this system is monitored in the Hall C alarm handler, and can be overseen by the Hall C Shift crew using the stripchart on the left large wall display (see below).
Instructions
- Parity DAQ Running - with Hall C Feedback passively running (Aug 02, 2020 HClog entry)
- Bring up this vnc session using
go_parity_feedback
under the cdaq account.
- Hall C running parity DAQ for charge feedback (Feb 12, 2020 HCLog entry) -- OLD, just for reference.
Useful Commands (on cdaq machines)
go_parity
Injector parity settings (IHWP status, Hall Laser IA settings, etc)go_parity_feedback
Bring up the Parity DAQ charge feedback VNC session (if Hall C is running alone; see below)go_Qasym_stripchart
Bring up the Hall C Charge Asym monitoring stripcharts (these should always be up on the big wall screens)
How to run the flipper script
- This script need to be run when the IHWP state changes and Hall A is not controlling our feedback.
- stop the run (parity daq)
- in the vnc session from above
ssh apar@adaq2
cd ~/feedback2019
./FlipPCvaluesHallC
You should see the hallc_IACell_setting variable change on the wall./checkPCvaules
- start a run (parity daq)
Contacts
- Bill Henry (Hall C)
- Cameron Clarke (Hall A)
- Caryn Palatchi (Hall A)