Difference between revisions of "RC Meeting, Wednesday, August 18, 2021"

From HallCWiki
Jump to: navigation, search
(Accelerator Status)
Line 24: Line 24:
  
 
= Accelerator Status =
 
= Accelerator Status =
* First beam to hall: September 1 (tentative) --> work on power supplies required for 5 pass
+
* First beam to hall: September 1-2 (tentative) High current tests --> work on power supplies required for 5 pass
 
* Expected start of Physics: September 4
 
* Expected start of Physics: September 4
  

Revision as of 14:54, 18 August 2021

RC Meeting Information

RC Daily Meeting at 3:00 PM, (remote)

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

Accelerator Status

  • First beam to hall: September 1-2 (tentative) High current tests --> work on power supplies required for 5 pass
  • Expected start of Physics: September 4

Hall Status

  • Beam pipe vs. SHMS: scattering chamber needs to be raised ~2 mm to allow SHMS rotation to 5.5 degrees
    • Scattering chamber movement complete (1.5 mm). Target ladder alignment tomorrow
  • Spectrometers (magnets and rotation)
  • Detector status
  • DAQ
  • Target (cooldown?)

Notices in Effect for Shift Crew

Current Issues

  • Nominal RC meeting time. Used to be ~4:30 PM (conference room conflict). Change to earlier time?