Difference between revisions of "RC Meeting, Wednesday, October 27 , 2021"

From HallCWiki
Jump to: navigation, search
(Hall C Status)
(Current Issues)
Line 21: Line 21:
 
# Replace flow switches for (HMS?) magnet power supplies: next opportunistic access (Joe Beaufait) (<span style="color:red"> '''PENDING''' </span>)
 
# Replace flow switches for (HMS?) magnet power supplies: next opportunistic access (Joe Beaufait) (<span style="color:red"> '''PENDING''' </span>)
 
# Q3 insulating vacuum spikes generating annoyance alarms that take minutes to recover. https://logbooks.jlab.org/entry/3930175 Noise levels on transducers look OK, but Junaid's plot indicates Q3 is burping:  https://logbooks.jlab.org/entry/3932992 .   
 
# Q3 insulating vacuum spikes generating annoyance alarms that take minutes to recover. https://logbooks.jlab.org/entry/3930175 Noise levels on transducers look OK, but Junaid's plot indicates Q3 is burping:  https://logbooks.jlab.org/entry/3932992 .   
# More serious HB LHe alarms. https://logbooks.jlab.org/entry/3933051 Always seems to start with a subtle, simultaneous increase in level in Q1/2/3. https://logbooks.jlab.org/entry/3929152 .
+
# Serious HB LHe low liquid level alarms. https://logbooks.jlab.org/entry/3933051 Always seems to start with a subtle, simultaneous increase in level in Q1/2/3. https://logbooks.jlab.org/entry/3929152 .
 
# Target ladder camera was identified to be bad: Joe Beaufait will order camera (<span style="color:red"> '''PENDING''' </span>)
 
# Target ladder camera was identified to be bad: Joe Beaufait will order camera (<span style="color:red"> '''PENDING''' </span>)
 
# Still running with no UPS on the SHMS cryo controls - Steve L. has ordered batteries and UPS. (<span style="color:red"> '''PENDING''' </span>)
 
# Still running with no UPS on the SHMS cryo controls - Steve L. has ordered batteries and UPS. (<span style="color:red"> '''PENDING''' </span>)

Revision as of 09:01, 27 October 2021


RC Meeting Information

RC Daily Meetings are at 10 am, remote connection link: https://bluejeans.com/861439920

Accelerator Status

  1. Beam delivery back to Halls B,C,D on owl shift.

Hall C Status

  1. Back in production at 42 muA on late swing. (Some beam early on swing, but mostly tuning for Hall B.)
  2. On late swing, alarms due to dropping HB LHe levels. We have our good days, but they always come back. Steve L intervened. https://logbooks.jlab.org/entry/3933018 https://logbooks.jlab.org/entry/3933051 He's set it so the HB is now over-filling a bit.
  3. End of swing, SHMS Q2 Interlock plus some sort of communication reset required on a screen I haven't seen before. https://logbooks.jlab.org/entry/3933073 Also Steve L. Recovery by 00:30 on owl. (NOTE TO SELF: ARE THEIR INSTRUCTIONS FOR THIS ON THE WIKI? IT TOOK ME 5 MINUTES TO FIND THAT ITTY BITTY HEART ON THE SCREEN.)
  4. Number of good pions is ????.

Current Run Plan

  1. Day shift only: Try to take 1 hour of Dummy target each day. (a 100% live hour)
  2. Tentatively scheduled: a BCM calibration on Wednesday mid-afternoon.
  3. Continue data taking until early Nov

Current Issues

  1. Replace flow switches for (HMS?) magnet power supplies: next opportunistic access (Joe Beaufait) ( PENDING )
  2. Q3 insulating vacuum spikes generating annoyance alarms that take minutes to recover. https://logbooks.jlab.org/entry/3930175 Noise levels on transducers look OK, but Junaid's plot indicates Q3 is burping: https://logbooks.jlab.org/entry/3932992 .
  3. Serious HB LHe low liquid level alarms. https://logbooks.jlab.org/entry/3933051 Always seems to start with a subtle, simultaneous increase in level in Q1/2/3. https://logbooks.jlab.org/entry/3929152 .
  4. Target ladder camera was identified to be bad: Joe Beaufait will order camera ( PENDING )
  5. Still running with no UPS on the SHMS cryo controls - Steve L. has ordered batteries and UPS. ( PENDING )
  6. HCCAM02 not functioning (lift required to replace).

Special Requests