Difference between revisions of "June 17, 2022"
From HallCWiki
Jump to navigationJump to search(28 intermediate revisions by the same user not shown) | |||
Line 37: | Line 37: | ||
* Jun 17 - Owl (today) | * Jun 17 - Owl (today) | ||
− | ** limited to 15 uA beam due to accelerator issues | + | ** limited to 15 uA beam due to accelerator issues (Ops will work on Hall C line today to try and give us higher currents) |
** completed the detector checkout part of run plan | ** completed the detector checkout part of run plan | ||
** while doing +/-8 cm C12 optics run plan, HMS Dipole interlocked (~ 4:30 am ) | ** while doing +/-8 cm C12 optics run plan, HMS Dipole interlocked (~ 4:30 am ) | ||
Line 47: | Line 47: | ||
*** [https://logbooks.jlab.org/entry/4003722 HMS Q1, Q2 Dipole interlocks] | *** [https://logbooks.jlab.org/entry/4003722 HMS Q1, Q2 Dipole interlocks] | ||
*** [https://logbooks.jlab.org/entry/4003720 HMS Dipole waterflow interlock explanation] | *** [https://logbooks.jlab.org/entry/4003720 HMS Dipole waterflow interlock explanation] | ||
− | *** | + | *** [https://logbooks.jlab.org/entry/4003803 HMS LCW snapshots of debris found] |
+ | *** S. Lassiter ramped magnets back up and there seems to be OK now. | ||
= Current Run Plan = | = Current Run Plan = | ||
− | * | + | * Complete Carbon Foil +/- 8 cm (part of HMS Optics plan) (<span style="color:darkgreen"> '''DONE''' </span>) |
+ | * Complete Single Carbon Foil on HMS | ||
+ | * Do Coincidence Trigger Checkout | ||
+ | * Do single Heep coin setting | ||
+ | * Begin production physics | ||
= Notices in Effect for Shift Crew = | = Notices in Effect for Shift Crew = | ||
− | * | + | * Please pro-rate ABU for max current limit in run plan (uA) in beam time accounting. For example, if we receive 15 uA instead of the max_current_limit in the run plan, then the ABU should be: ABU_prorated = 15/(max current limit) * ABU |
+ | * Message from Ole Hansen: There will be a brief (<30min) outage of the Hall A and Hall C /work servers on Tuesday (6/21). This will happen during the workday already instead of the usual 5pm-10pm time slot for monthly IT maintenance. Please plan accordingly, i.e. don't start any mass replays ;-) | ||
= Current Issues = | = Current Issues = | ||
Line 59: | Line 65: | ||
= Planned Accesses to the Hall = | = Planned Accesses to the Hall = | ||
− | * | + | * During the next accelerator maintenance period (Wed Jun 22): |
+ | ** S. Lassiter needs to put crush washers in LCW filters, so we may see a little bit of water by the HMS boogie for now, until he can put the washers next week, during maintenance period [https://logbooks.jlab.org/entry/4003796 HMS Dipole LCW] (<span style="color:red"> '''PENDING''' </span>) | ||
+ | ** Need to check SHMS ROC 4 Slot 9 Channel 0 FADC for potentially loose connection, as Column 5, Row 1 block appears to have no occupancy. [https://logbooks.jlab.org/entry/4003855 SHMS Cal Occupancy] (<span style="color:red"> '''PENDING''' </span>) | ||
+ | ** Xinzhan Bai request to go to restricted access to quickly swap MPD electronics out and check signals (~ 30 min.), whenever there is extended down (most likely during next accelerator maintenance period) : Contact: xbai@jlab.org, cell: (434) 422-2809 (<span style="color:red"> '''PENDING''' </span>) | ||
= Planned Accelerator Configuration Changes = | = Planned Accelerator Configuration Changes = | ||
Line 65: | Line 74: | ||
= Special Requests = | = Special Requests = | ||
− | * | + | * Mark Jones would like to take HMS optics data with a 4x4 mm^2 raster at some point (when HMS is at a lower momentum, i.e., current setting) for checks. (<span style="color:red"> '''PENDING''' </span>) |
Latest revision as of 17:35, 17 June 2022
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
- Shift Signup (Read only)
- PionLT_2022_Physics_Status
- KaonLT Logbook - Used for PionLT updates too
- Physics analysis updates should be cross posted here
- Run Plans
- Hall-C Controls
- Hall-C Logbook
- MCC White Board
Current Status
- Jun 16 - Swing (yesterday)
- Received up to 25 uA of beam and did Carbon Hole check Carbon Hole (Raster ON), Carbon Hole (Raster OFF)
- started HMS optics studies
- Jun 17 - Owl (today)
- limited to 15 uA beam due to accelerator issues (Ops will work on Hall C line today to try and give us higher currents)
- completed the detector checkout part of run plan
- while doing +/-8 cm C12 optics run plan, HMS Dipole interlocked (~ 4:30 am )
- SHMS optics was taken instead in the meantime
- towards the end of Owl, HMS Q2, Q2 Dipole had all went to interlock
- Jun 17 - Day (today)
- S. Lassiter arrived and it currently in the Hall with Hall C techs working
- HMS Q1, Q2 Dipole interlocks
- HMS Dipole waterflow interlock explanation
- HMS LCW snapshots of debris found
- S. Lassiter ramped magnets back up and there seems to be OK now.
- S. Lassiter arrived and it currently in the Hall with Hall C techs working
Current Run Plan
- Complete Carbon Foil +/- 8 cm (part of HMS Optics plan) ( DONE )
- Complete Single Carbon Foil on HMS
- Do Coincidence Trigger Checkout
- Do single Heep coin setting
- Begin production physics
Notices in Effect for Shift Crew
- Please pro-rate ABU for max current limit in run plan (uA) in beam time accounting. For example, if we receive 15 uA instead of the max_current_limit in the run plan, then the ABU should be: ABU_prorated = 15/(max current limit) * ABU
- Message from Ole Hansen: There will be a brief (<30min) outage of the Hall A and Hall C /work servers on Tuesday (6/21). This will happen during the workday already instead of the usual 5pm-10pm time slot for monthly IT maintenance. Please plan accordingly, i.e. don't start any mass replays ;-)
Current Issues
Planned Accesses to the Hall
- During the next accelerator maintenance period (Wed Jun 22):
- S. Lassiter needs to put crush washers in LCW filters, so we may see a little bit of water by the HMS boogie for now, until he can put the washers next week, during maintenance period HMS Dipole LCW ( PENDING )
- Need to check SHMS ROC 4 Slot 9 Channel 0 FADC for potentially loose connection, as Column 5, Row 1 block appears to have no occupancy. SHMS Cal Occupancy ( PENDING )
- Xinzhan Bai request to go to restricted access to quickly swap MPD electronics out and check signals (~ 30 min.), whenever there is extended down (most likely during next accelerator maintenance period) : Contact: xbai@jlab.org, cell: (434) 422-2809 ( PENDING )
Planned Accelerator Configuration Changes
Special Requests
- Mark Jones would like to take HMS optics data with a 4x4 mm^2 raster at some point (when HMS is at a lower momentum, i.e., current setting) for checks. ( PENDING )