(New page: ==Rates Update== Rates code now matches what Patricia gets. The issue was in the spectrometer acceptance -- I was using a larger acceptance based on old calculations of what the SHMS could...)
 
Line 2: Line 2:
 
Rates code now matches what Patricia gets. The issue was in the spectrometer acceptance -- I was using a larger acceptance based on old calculations of what the SHMS could do. This has been fixed, the points on Azz and b1d have been moved to the central x value that the range is over, and the dark points on the kinematics plots show where the spectrometers will sit. This is using [[Elong-13-05-01-Azz-Method-2#Azz_Formalism_-_Method_2|what I've called Azz method 2]] to calculate the uncertainties.
 
Rates code now matches what Patricia gets. The issue was in the spectrometer acceptance -- I was using a larger acceptance based on old calculations of what the SHMS could do. This has been fixed, the points on Azz and b1d have been moved to the central x value that the range is over, and the dark points on the kinematics plots show where the spectrometers will sit. This is using [[Elong-13-05-01-Azz-Method-2#Azz_Formalism_-_Method_2|what I've called Azz method 2]] to calculate the uncertainties.
  
==PAC = 50% Time Efficiency==
+
==Current Good Estimate, No x Cuts==
  
[[Image: 2013-05-02-50percent.png]]
+
Cuts: W>2
 +
[[Image: 2013-05-02-100percent.png]]
  
 +
==No x Cuts, Loose W cut==
  
==PAC = 100% Time Efficiency==
+
Cuts: W>1.85
 +
[[Image: 2013-05-02-loosew.png]]
  
[[Image: 2013-05-02-100percent.png]]
+
== ==

Revision as of 15:04, 3 May 2013

Rates Update

Rates code now matches what Patricia gets. The issue was in the spectrometer acceptance -- I was using a larger acceptance based on old calculations of what the SHMS could do. This has been fixed, the points on Azz and b1d have been moved to the central x value that the range is over, and the dark points on the kinematics plots show where the spectrometers will sit. This is using what I've called Azz method 2 to calculate the uncertainties.

Current Good Estimate, No x Cuts

Cuts: W>2 2013-05-02-100percent.png

No x Cuts, Loose W cut

Cuts: W>1.85 2013-05-02-loosew.png