Difference between revisions of "November 28, 2022"

From HallCWiki
Jump to navigationJump to search
 
(4 intermediate revisions by the same user not shown)
Line 39: Line 39:
 
* Beamline vacuum - https://logbooks.jlab.org/entry/4089716 https://logbooks.jlab.org/entry/4089883
 
* Beamline vacuum - https://logbooks.jlab.org/entry/4089716 https://logbooks.jlab.org/entry/4089883
 
* Unexpected drop to restricted access on Saturday morning. Took 4 hrs to come back to beam permit. https://logbooks.jlab.org/entry/4091594
 
* Unexpected drop to restricted access on Saturday morning. Took 4 hrs to come back to beam permit. https://logbooks.jlab.org/entry/4091594
 +
** Random type of failure - trying to resolve it with the manufacturer.
 
* 2L02 vacuum issues - https://logbooks.jlab.org/entry/4091621
 
* 2L02 vacuum issues - https://logbooks.jlab.org/entry/4091621
 +
 +
=Issues=
 +
* None if you could believe that. (Nevermind)
 +
* HMS shield temperature unknown - https://logbooks.jlab.org/entry/4092473 https://logbooks.jlab.org/entry/4092533
 +
*Runs not copied to MSS in 2+ days - https://logbooks.jlab.org/entry/4092462
  
 
= Notes =
 
= Notes =
Line 46: Line 52:
 
** When rotating to 20 degrees from smaller HMS angle, it is ok to go directly to 20 degrees.
 
** When rotating to 20 degrees from smaller HMS angle, it is ok to go directly to 20 degrees.
 
** When rotating to 20 degrees from larger angle, first rotate to 19 degrees, and then to 20 degrees.
 
** When rotating to 20 degrees from larger angle, first rotate to 19 degrees, and then to 20 degrees.
 
+
* SHMS DAQ work during the Christmas break by Bob Michaels?
  
 
= To do =
 
= To do =
 
Take more data!
 
Take more data!

Latest revision as of 11:10, 28 November 2022

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

  • Smooth running since Wednesday swing shift - completed data taking with target ladder I.
  • Beam is off and hall is in the restricted access for the target ladder change work.
  • Target work is anticipated to be done around Wednesday swing shift

Run Plan

  • HMS EMC effect data taking at 20 deg and SHMS SRC data taking at 8 deg with target ladder II.

Resolved Issues

Issues

Notes

  • SHMS rotation to 8 deg: Rotating SHMS below 8 deg will trip the limit switch. Start with putting 8.1 or 8.2 deg on the rotation GUI to see the angle offset first then correct for it.
  • HMS rotation to 20 deg: There is an increased chance that the rotation will get "stuck" and require expert intervention.
    • When rotating to 20 degrees from smaller HMS angle, it is ok to go directly to 20 degrees.
    • When rotating to 20 degrees from larger angle, first rotate to 19 degrees, and then to 20 degrees.
  • SHMS DAQ work during the Christmas break by Bob Michaels?

To do

Take more data!