|
|
Line 1: |
Line 1: |
− | = RC Meeting Information =
| + | Nothing here |
− | | |
− | <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b>
| |
− | * Zoom remote connection information:
| |
− | Join ZoomGov Meeting
| |
− | https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
| |
− | Meeting ID: 160 710 0885
| |
− | Passcode: 595071
| |
− | One tap mobile
| |
− | +16692545252,,1607100885# US (San Jose)
| |
− | +16468287666,,1607100885# US (New York)
| |
− | Dial by your location
| |
− | +1 669 254 5252 US (San Jose)
| |
− | +1 646 828 7666 US (New York)
| |
− | +1 669 216 1590 US (San Jose)
| |
− | +1 551 285 1373 US
| |
− | 833 568 8864 US Toll-free
| |
− | Meeting ID: 160 710 0885
| |
− | Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
| |
− | | |
− | = Useful Links =
| |
− | | |
− | * [https://misportal.jlab.org/mis/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-XEM2 Shift Signup ('''Read only''')]
| |
− | ** [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-XEM2 Shift Signup]
| |
− | | |
− | * [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls]
| |
− | * [https://logbooks.jlab.org/book/hallc Hall-C Logbook]
| |
− | * [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board]
| |
− | | |
− | = Current Status =
| |
− | * Accelerator maintenance day.
| |
− | * Opportunistic access for Hall C walkthrough, SoLID test (Jimmy et al), SHMS Q1 power supply check for the dead fan by Ellen, SHMS HB temperature sensor and ice accusation check on the SHMS by Heidi.
| |
− | * Plan is to lock the linacs up around at the end of the shift.
| |
− | * Positron data taking at HMS 35 degrees is complete. SHMS took electron data at -9.2 GeV and 10 deg with loose HV detector configuration parasitically.
| |
− | * Finished setting 1 of high Q2 electron data taking in the HMS (-4.08 GeV and 35 deg). SHMS kinematics remains the same but some of the pre shower blocks are turned off.
| |
− | * Started setting 2 of high Q2 electron data taking in the HMS (-3.57 GeV and 35 deg) during the owl. Data taking with 4He is half way through.
| |
− | | |
− | = Current Run Plan =
| |
− | * Resume data taking at the setting 2 of high Q2 electron data taking with 3He, Al dummy, and 12C targets.
| |
− | * 10 different HMS settings in total. Mostly with 3He, 4He, Al dummy, 12C, and 63Cu targets.
| |
− | | |
− | = Notices in Effect for Shift Crew =
| |
− | * Beam current for the Helium targets is limited to 40 uA!
| |
− | * Always let the RC know with questions and any issues that require expert help. https://logbooks.jlab.org/entry/4109412
| |
− | | |
− | = Current Issues =
| |
− | * Accelerator issues to provide high beam current to Hall A and C.
| |
− | * Lowering the Hall C current to reduce beam trips in a way the split between Hall A and C current is not in equitable way.
| |
− | | |
− | | |
− | = Planned Accesses to the Hall =
| |
− | *
| |
− | | |
− | = Planned Accelerator Configuration Changes =
| |
− | *
| |
− | | |
− | = Special Requests =
| |