Difference between revisions of "January 26, 2023"

From HallCWiki
Jump to navigationJump to search
Line 29: Line 29:
  
 
= Current Status =
 
= Current Status =
* Finished setting 2 of high Q2 electron data taking in the HMS (-4.08 GeV and 35 deg). SHMS kinematics remains the same but some of the pre shower blocks are turned off.
+
* Finished setting 3 of high Q2 electron data taking in the HMS (-3.09 GeV and 35 deg). Completed swing 1/24/2023
* Started setting 3 of high Q2 electron data taking in the HMS (-3.57 GeV and 35 deg) during the owl. Data taking with 4He is half way through.
+
* Helium-3 remains for setting 4 of high Q2 electron data taking in the HMS (-2.72 GeV and 35 deg).
 +
*: Carbon took 10 hours beam on time, 24 actual.
 +
*: Helium-4 took 11.5 hours beam on time, 17 actual.
 +
*: Aluminum stand-in took 4.5 hours beam on time, 6 actual.
 +
*: Helium-3 Est to take 27 hrs beam on time, <TBD> actual.
 +
*Target temperature spike for loop 1 AND loop 2:
 +
*: https://logbooks.jlab.org/entry/4117272
 +
*; Loop 2 had a spike during production running, will need cut out
 +
*: https://logbooks.jlab.org/entry/4117306
 +
**Greg looked into the spikes and found nothing of note.  Suggested to continue as planned.
 +
**: https://logbooks.jlab.org/entry/4117470
 +
** Swing into owl target moved to loop 1, no issues.
 +
 
 +
*MCC currently re-steering the beam.  Don't know how long this will take
 +
 
 +
*Data taking moving forward (2.5 days Hopefully):
 +
*#Setting 4: 27 hours (when beam returns)
 +
*#Setting 5: 11 hours including increased time for He3
 +
*#Setting 6: 6 hours '''
 +
*#Setting 7: 4 hours '''
 +
*#Setting 8: 3 hours '''
 +
*#Setting 9: 3 hours '''
 +
*#Setting 10: 3 hours '''
 +
 
 +
*Data quality checks of SHMS?
  
 
= Current Run Plan =
 
= Current Run Plan =

Revision as of 10:58, 26 January 2023

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

  • Finished setting 3 of high Q2 electron data taking in the HMS (-3.09 GeV and 35 deg). Completed swing 1/24/2023
  • Helium-3 remains for setting 4 of high Q2 electron data taking in the HMS (-2.72 GeV and 35 deg).
    Carbon took 10 hours beam on time, 24 actual.
    Helium-4 took 11.5 hours beam on time, 17 actual.
    Aluminum stand-in took 4.5 hours beam on time, 6 actual.
    Helium-3 Est to take 27 hrs beam on time, <TBD> actual.
  • Target temperature spike for loop 1 AND loop 2:
    https://logbooks.jlab.org/entry/4117272
    Loop 2 had a spike during production running, will need cut out
    https://logbooks.jlab.org/entry/4117306
  • MCC currently re-steering the beam. Don't know how long this will take
  • Data taking moving forward (2.5 days Hopefully):
    1. Setting 4: 27 hours (when beam returns)
    2. Setting 5: 11 hours including increased time for He3
    3. Setting 6: 6 hours
    4. Setting 7: 4 hours
    5. Setting 8: 3 hours
    6. Setting 9: 3 hours
    7. Setting 10: 3 hours
  • Data quality checks of SHMS?

Current Run Plan

  • Resume data taking at the setting 2 of high Q2 electron data taking with 3He, Al dummy, and 12C targets.
  • 10 different HMS settings in total. Mostly with 3He, 4He, Al dummy, 12C, and 63Cu targets.

Notices in Effect for Shift Crew

Current Issues

  • Accelerator issues to provide high beam current to Hall A and C.
  • Lowering the Hall C current to reduce beam trips in a way the split between Hall A and C current is not in equitable way.


Planned Accesses to the Hall

Planned Accelerator Configuration Changes

Special Requests