Difference between revisions of "September 19, 2023"
From HallCWiki
Jump to navigationJump to searchLine 28: | Line 28: | ||
= Current Issues = | = Current Issues = | ||
− | * | + | * MQF3M01 (small Moller quad) remote control not working |
+ | * 3 channels missing in calorimeter | ||
= Planned Accesses to the Hall = | = Planned Accesses to the Hall = |
Revision as of 08:48, 19 September 2023
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information: https://logbooks.jlab.org/entry/4171589
Useful Links
Current Status
- Finished 3, 1-hour runs at 5 pass elastic settings
- Attempted arc energy measurement, BCM calibration yesterday: not completed
- Restarted HMS high momentum optics
- HMS high momentum optics data taking underway
Current Run Plan
- Short term run plan: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan
- HMS high momentum optics at P_HMS=-6.117 GeV and -5.639 GeV
- Arc energy measurement this morning
Notices in Effect for Shift Crew
Current Issues
- MQF3M01 (small Moller quad) remote control not working
- 3 channels missing in calorimeter