Difference between revisions of "October 5, 2023"
(12 intermediate revisions by 2 users not shown) | |||
Line 3: | Line 3: | ||
= RC Meeting Information = | = RC Meeting Information = | ||
− | Current RC: | + | Current RC: William Henry |
<b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> | <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> | ||
Line 23: | Line 23: | ||
= Summary = | = Summary = | ||
− | '''Wednesday | + | Beam was taken away at 8am for the planned beam studies. The beam studies are estimated to be 6 hours. The Hall went to controlled access at 9:30 am to install the wings on the nps magnet. Please notify the shift crew or RC if you are planning to work in the hall. There will be a RC meeting today at 11am. |
+ | |||
+ | '''Wednesday Day, Swing and OWL this morning''' shifts were smoothly taking production data on LH2, LD2, and dummy ( | ||
Middle '''Swing''' we had Q1 trip when the NPS magnet was powered off before ramping to zero [https://logbooks.jlab.org/entry/4193088] | Middle '''Swing''' we had Q1 trip when the NPS magnet was powered off before ramping to zero [https://logbooks.jlab.org/entry/4193088] | ||
The current plan is to continue running at the KinC_x50_2 production setting. We need to stay at this setting for the total of ~2 days of running. | The current plan is to continue running at the KinC_x50_2 production setting. We need to stay at this setting for the total of ~2 days of running. | ||
+ | |||
+ | # KinC_x50_2 "cycle", SPARSIFICATION ON (CODA Configure coin_sparse) | ||
+ | ## LD2 target | ||
+ | ### One hour run on LD2, ps6=0, 15 uA (0.03 C)<b><span style ="color:red">Complete Runs 1614-1617</span></b> | ||
+ | ### ''Expert login to nps-vtp1:nps-vtp/cfg/coin_sparse. cp nps-vtp.cfg_narrow_sparse_window nps-vtp.cfg'' | ||
+ | ### One hour run on LD2, ps6=0, 15 uA (0.03 C) | ||
+ | #### ''Expert analyze for any differences in previous two runs'' | ||
+ | ### One hour run on LD2, ps6=0, 15 uA (0.03 C) | ||
+ | ### NPS Sweep Magnet OFF 30 min run LD2 ps6=0 15 uA | ||
+ | ### NPS Sweep ON 468 Amp, Correctors off | ||
+ | ### Efficiency run, 30 min LD2 15 uA , ps3=5 or as necessary for ≤ 2 kHz trigger rate to CODA | ||
+ | ## LH2 Target <b><span style ="color:red">Complete Runs 1618-1621</span></b> | ||
+ | ### One hour run on LH2, ps6=0, 30 uA (0.06 C) | ||
+ | ### ''Expert login to nps-vtp1:nps-vtp/cfg/coin_sparse. cp nps-vtp.cfg_wide_sparse_window nps-vtp.cfg'' | ||
+ | ### One hour run on LH2, ps6=0, 30 uA (0.06 C) | ||
+ | ### ''Expert login to nps-vtp1:nps-vtp/cfg/coin_sparse. cp nps-vtp.cfg_narrow_sparse_window nps-vtp.cfg'' | ||
+ | ### One hour run on LH2, ps6=0, 30 uA (0.06 C) | ||
+ | ### Efficiency Run 30 min LH2 30uA, ps3=4 or as necessary for ≤ 2 kHz trigger rate to CODA (0.03 C) | ||
+ | ## 30 min run on Dummy at 30 uA (0.03 C), ps6=0 <b><span style ="color:red">Complete Runs 1622</span></b> | ||
+ | ## Three 1-hour runs on LD2, ps6=0, 15 uA (0.09 C total) <b><span style ="color:red">Complete Runs 1623-1625</span></b> | ||
+ | |||
+ | * Wednesday Swing, Thurs Owl | ||
+ | |||
+ | # KinC_x50_2 "cycle", SPARSIFICATION ON (CODA Configure coin_sparse) | ||
+ | ## Three 1-hour runs on LD2, ps6=0, 15 uA (0.09 C) <b><span style ="color:red">Complete Runs 1627-1629</span></b> | ||
+ | ## Efficiency run, 30 min LD2 15 uA , ps3=5 or as necessary for ≤ 2 kHz trigger rate to CODA (0.03 C) | ||
+ | ## Three 1-hour run on LH2, ps6=0, 30 uA (0.06 C) <b><span style ="color:red">Partially Complete Runs 1630-1631</span></b> <b><span style ="color:red">We are here as of Start of DAY shift </span></b> | ||
+ | ## Efficiency Run 30 min LH2 30uA, ps3=4 or as necessary for ≤ 2 kHz trigger rate to CODA (0.03 C) | ||
+ | ## 30 min run on Dummy at 30 uA (0.03 C), ps6=0 | ||
+ | ## Three 1-hour runs on LD2, ps6=0, 15 uA (0.09 C) | ||
+ | |||
+ | * | ||
+ | * | ||
= Run plan = | = Run plan = | ||
Line 39: | Line 74: | ||
* We need to stay at KinC_x50_2 production setting for the total 3 days of running. | * We need to stay at KinC_x50_2 production setting for the total 3 days of running. | ||
* Moller measurement. | * Moller measurement. | ||
− | * Access | + | * Access today to install new "26 deg wings" on the Sweep Magnet. |
+ | * Maintenance day next Wednesday. Walk-thru on the schedule |
Latest revision as of 11:33, 5 October 2023
RC Meeting Information
Current RC: William Henry
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
Zoom remote connection information: Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX Meeting ID: 161 701 5555 Passcode: 288953
Useful Links
Summary
Beam was taken away at 8am for the planned beam studies. The beam studies are estimated to be 6 hours. The Hall went to controlled access at 9:30 am to install the wings on the nps magnet. Please notify the shift crew or RC if you are planning to work in the hall. There will be a RC meeting today at 11am.
Wednesday Day, Swing and OWL this morning shifts were smoothly taking production data on LH2, LD2, and dummy (
Middle Swing we had Q1 trip when the NPS magnet was powered off before ramping to zero [1] The current plan is to continue running at the KinC_x50_2 production setting. We need to stay at this setting for the total of ~2 days of running.
- KinC_x50_2 "cycle", SPARSIFICATION ON (CODA Configure coin_sparse)
- LD2 target
- One hour run on LD2, ps6=0, 15 uA (0.03 C)Complete Runs 1614-1617
- Expert login to nps-vtp1:nps-vtp/cfg/coin_sparse. cp nps-vtp.cfg_narrow_sparse_window nps-vtp.cfg
- One hour run on LD2, ps6=0, 15 uA (0.03 C)
- Expert analyze for any differences in previous two runs
- One hour run on LD2, ps6=0, 15 uA (0.03 C)
- NPS Sweep Magnet OFF 30 min run LD2 ps6=0 15 uA
- NPS Sweep ON 468 Amp, Correctors off
- Efficiency run, 30 min LD2 15 uA , ps3=5 or as necessary for ≤ 2 kHz trigger rate to CODA
- LH2 Target Complete Runs 1618-1621
- One hour run on LH2, ps6=0, 30 uA (0.06 C)
- Expert login to nps-vtp1:nps-vtp/cfg/coin_sparse. cp nps-vtp.cfg_wide_sparse_window nps-vtp.cfg
- One hour run on LH2, ps6=0, 30 uA (0.06 C)
- Expert login to nps-vtp1:nps-vtp/cfg/coin_sparse. cp nps-vtp.cfg_narrow_sparse_window nps-vtp.cfg
- One hour run on LH2, ps6=0, 30 uA (0.06 C)
- Efficiency Run 30 min LH2 30uA, ps3=4 or as necessary for ≤ 2 kHz trigger rate to CODA (0.03 C)
- 30 min run on Dummy at 30 uA (0.03 C), ps6=0 Complete Runs 1622
- Three 1-hour runs on LD2, ps6=0, 15 uA (0.09 C total) Complete Runs 1623-1625
- LD2 target
- Wednesday Swing, Thurs Owl
- KinC_x50_2 "cycle", SPARSIFICATION ON (CODA Configure coin_sparse)
- Three 1-hour runs on LD2, ps6=0, 15 uA (0.09 C) Complete Runs 1627-1629
- Efficiency run, 30 min LD2 15 uA , ps3=5 or as necessary for ≤ 2 kHz trigger rate to CODA (0.03 C)
- Three 1-hour run on LH2, ps6=0, 30 uA (0.06 C) Partially Complete Runs 1630-1631 We are here as of Start of DAY shift
- Efficiency Run 30 min LH2 30uA, ps3=4 or as necessary for ≤ 2 kHz trigger rate to CODA (0.03 C)
- 30 min run on Dummy at 30 uA (0.03 C), ps6=0
- Three 1-hour runs on LD2, ps6=0, 15 uA (0.09 C)
Run plan
The run plan is available here: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan
Note the simplified table of the upstream and downstream corrector currents vs. SHMS angle uploaded by Dave Gaskell. The shift workers should be able to use this table to provide starting values for the corrector currents when MCC executes the NPS sweeper setup procedure at a new configuration.
Future plans
- We need to stay at KinC_x50_2 production setting for the total 3 days of running.
- Moller measurement.
- Access today to install new "26 deg wings" on the Sweep Magnet.
- Maintenance day next Wednesday. Walk-thru on the schedule