Difference between revisions of "October 26, 2023"
From HallCWiki
Jump to navigationJump to search (Created page with "= RC Meeting Information = <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> * Zoom remote connection informa...") |
|||
Line 29: | Line 29: | ||
= Current Status = | = Current Status = | ||
− | + | 1. Continue production | |
− | + | 2. Half wave plane change at 11 a.m. | |
+ | 3. Moller measurement starting 8:30 a.m., last Friday for the day shift. | ||
= Current Run Plan = | = Current Run Plan = |
Revision as of 09:43, 26 October 2023
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
Current Status
1. Continue production 2. Half wave plane change at 11 a.m. 3. Moller measurement starting 8:30 a.m., last Friday for the day shift.
Current Run Plan
- Moller measurement happening now
- Production data taking when the Moller is done:https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan
- Run plan into the future: https://logbooks.jlab.org/entry/4201659
Notices in Effect for Shift Crew
- Always keep on NPS High Voltage
Current Issues
- https://logbooks.jlab.org/entry/4200664
- troubleshooting LV distribution once board 0 is added back
Planned Accesses to the Hall Today
- Controlled access tomorrow (Beam studies/ maintenance day) - those that need to access the hall on wed. please call the RC ahead of time
Planned Accelerator Configuration Changes
- Pass change in Hall A on the 24th
Special Requests
- Opportunistic Cosmics requested if down for long