Difference between revisions of "October 26, 2023"

From HallCWiki
Jump to navigationJump to search
Line 37: Line 37:
 
* Production data taking when the Moller is done:https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan
 
* Production data taking when the Moller is done:https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan
 
*Run plan into the future: https://logbooks.jlab.org/entry/4201659
 
*Run plan into the future: https://logbooks.jlab.org/entry/4201659
 
= Notices in Effect for Shift Crew =
 
* Always keep on NPS High Voltage
 
  
 
= Current Issues =
 
= Current Issues =

Revision as of 09:44, 26 October 2023

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

1. Continue production 2. Half wave plane change at 11 a.m. 3. Moller measurement starting 8:30 a.m., last Friday for the day shift.

Current Run Plan

Current Issues

Planned Accesses to the Hall Today

  • Controlled access tomorrow (Beam studies/ maintenance day) - those that need to access the hall on wed. please call the RC ahead of time

Planned Accelerator Configuration Changes

  • Pass change in Hall A on the 24th

Special Requests

  • Opportunistic Cosmics requested if down for long