Difference between revisions of "October 27, 2023"
(Created page with "= RC Meeting Information =https://hallcweb.jlab.org/wiki/index.php?title=October_26,_2023&action=edit <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the co...") |
|||
Line 29: | Line 29: | ||
= Past 24 hours = | = Past 24 hours = | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
= Current Status = | = Current Status = | ||
Line 47: | Line 35: | ||
= Current Run Plan = | = Current Run Plan = | ||
+ | * Continue production | ||
* Half wave plane change at 11 a.m. | * Half wave plane change at 11 a.m. | ||
* Moller measurement starting 8:30 a.m., last Friday for the day shift. | * Moller measurement starting 8:30 a.m., last Friday for the day shift. | ||
= Issues = | = Issues = | ||
− | * | + | * Thanks to Bob's effort, the scalar is now displaying in between the runs. This is a significant time-saver especially during the part of the run plan when the PS needs to be changed every 20 minutes. (Thanks Bob) |
− | * | + | * DAQ seems to be able to handle 20% higher right, LD2 runs are currently running at 12 uA (instead of 10 uA from the previous day.) |
− | + | * 8pm, DAQ crashed in the middle of the run, Alex was contacted to the restoration. (Near future protocol on DAQ issues, Bob is the on-call for the DAQ issues). | |
− | + | * 10 am, HMS Colimator GUI got stuck, reset procedure was attempted, and hall access was requested to manually reset the IOC: https://logbooks.jlab.org/entry/4209134 | |
− | + | * 23 pm, The HMS Q3 software interlock tripped, and lost current, the experience shifter was able to clear the interlock and resume production: https://logbooks.jlab.org/entry/4209643 | |
+ | |||
+ | = A few new/raised concerns: = | ||
+ | 1. During the DAQ Coda configuration changes, the instruction is very unclear if a "RESET" procedure is needed. We need to make the wiki instructions clear on this part. Because of this ambiguity, we potentially might have lost 1 good run on this. | ||
+ | 2. Part of the run plan requires changing setting, and beam current, frequently, as a result, the run sheets are not completely filled. | ||
+ | 3. DAQ crashes during the run-ending process, in this case, the Run End log is not generated. It is not clear how to keep records for such runs | ||
+ | |||
+ | =Special Studies= | ||
+ | Sweeper off test results: | ||
+ | 1. LD2, 12 uA, Strip chart: https://logbooks.jlab.org/entry/4210027 | ||
+ | 2. LD2 Sweeper on: https://logbooks.jlab.org/entry/4209547 | ||
+ | 3. LD2 Sweeper off: https://logbooks.jlab.org/entry/4209596 | ||
+ | 4. Sweeper run 2272: https://logbooks.jlab.org/entry/4209605 | ||
= Planned Accesses to the Hall Today= | = Planned Accesses to the Hall Today= | ||
= Planned Accelerator Configuration Changes = | = Planned Accelerator Configuration Changes = | ||
− | * Pass change in Hall A on the | + | * Pass change in Hall A on the 31st |
= Special Requests = | = Special Requests = |
Revision as of 00:25, 28 October 2023
= RC Meeting Information =https://hallcweb.jlab.org/wiki/index.php?title=October_26,_2023&action=edit
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
Past 24 hours
Current Status
- Continue production
- RC summary: https://logbooks.jlab.org/entry/4209118
Current Run Plan
- Continue production
- Half wave plane change at 11 a.m.
- Moller measurement starting 8:30 a.m., last Friday for the day shift.
Issues
- Thanks to Bob's effort, the scalar is now displaying in between the runs. This is a significant time-saver especially during the part of the run plan when the PS needs to be changed every 20 minutes. (Thanks Bob)
- DAQ seems to be able to handle 20% higher right, LD2 runs are currently running at 12 uA (instead of 10 uA from the previous day.)
- 8pm, DAQ crashed in the middle of the run, Alex was contacted to the restoration. (Near future protocol on DAQ issues, Bob is the on-call for the DAQ issues).
- 10 am, HMS Colimator GUI got stuck, reset procedure was attempted, and hall access was requested to manually reset the IOC: https://logbooks.jlab.org/entry/4209134
- 23 pm, The HMS Q3 software interlock tripped, and lost current, the experience shifter was able to clear the interlock and resume production: https://logbooks.jlab.org/entry/4209643
A few new/raised concerns:
1. During the DAQ Coda configuration changes, the instruction is very unclear if a "RESET" procedure is needed. We need to make the wiki instructions clear on this part. Because of this ambiguity, we potentially might have lost 1 good run on this. 2. Part of the run plan requires changing setting, and beam current, frequently, as a result, the run sheets are not completely filled. 3. DAQ crashes during the run-ending process, in this case, the Run End log is not generated. It is not clear how to keep records for such runs
Special Studies
Sweeper off test results: 1. LD2, 12 uA, Strip chart: https://logbooks.jlab.org/entry/4210027 2. LD2 Sweeper on: https://logbooks.jlab.org/entry/4209547 3. LD2 Sweeper off: https://logbooks.jlab.org/entry/4209596 4. Sweeper run 2272: https://logbooks.jlab.org/entry/4209605
Planned Accesses to the Hall Today
Planned Accelerator Configuration Changes
- Pass change in Hall A on the 31st