(Created page with "= RC Meeting Information =https://hallcweb.jlab.org/wiki/index.php?title=October_26,_2023&action=edit <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the co...")
 
Line 29: Line 29:
  
 
= Past 24 hours =
 
= Past 24 hours =
 
Items addressed from our side inside of the Hall:
 
* Heidi replaced an N2 pressure sensor. Thermal hotspot Camera was checked?
 
* Jerry and others worked on the pump on top of the HMS
 
* Ellen went into the hall to check various cryocomponents.
 
* AC work in the CH completed
 
 
Items addressed from our side of the Hall:
 
* Alex and Hanjie completed the DAQ computer transfer, the DAQ was verified with LED data taking. The 50k replay script works. Alex is confident with a 10% higher current.
 
* Bob worked on the scaler.
 
* Bill Henry worked on repairing the alarm handler. (Starting the DAQ no longer generates the warning on the alarm handler.)
 
* Peter verified the new changes for the hcana, message to Mark: "Please go ahead and commit the changes".
 
  
 
= Current Status =
 
= Current Status =
Line 47: Line 35:
  
 
= Current Run Plan =
 
= Current Run Plan =
 +
* Continue production
 
* Half wave plane change at 11 a.m.
 
* Half wave plane change at 11 a.m.
 
* Moller measurement starting 8:30 a.m., last Friday for the day shift.
 
* Moller measurement starting 8:30 a.m., last Friday for the day shift.
  
 
= Issues =
 
= Issues =
* Newly failed NPS modules: https://logbooks.jlab.org/entry/4209099
+
* Thanks to Bob's effort, the scalar is now displaying in between the runs. This is a significant time-saver especially during the part of the run plan when the PS needs to be changed every 20 minutes. (Thanks Bob)
* NPS LV due to the broken PMTs in column 2: https://logbooks.jlab.org/entry/4209048
+
* DAQ seems to be able to handle 20% higher right, LD2 runs are currently running at 12 uA (instead of 10 uA from the previous day.)
* Lost communication with the raster IOC: https://logbooks.jlab.org/entry/4208767
+
* 8pm, DAQ crashed in the middle of the run, Alex was contacted to the restoration. (Near future protocol on DAQ issues, Bob is the on-call for the DAQ issues).
* Alarm handler no warning? https://logbooks.jlab.org/entry/4209113
+
* 10 am, HMS Colimator GUI got stuck, reset procedure was attempted, and hall access was requested to manually reset the IOC: https://logbooks.jlab.org/entry/4209134
* Sieve got stuck: https://logbooks.jlab.org/entry/4209150
+
* 23 pm, The HMS Q3 software interlock tripped, and lost current, the experience shifter was able to clear the interlock and resume production: https://logbooks.jlab.org/entry/4209643
 +
 
 +
= A few new/raised concerns: =
 +
1. During the DAQ Coda configuration changes, the instruction is very unclear if a "RESET" procedure is needed. We need to make the wiki instructions clear on this part. Because of this ambiguity, we potentially might have lost 1 good run on this.
 +
2. Part of the run plan requires changing setting, and beam current, frequently, as a result, the run sheets are not completely filled.
 +
3. DAQ crashes during the run-ending process, in this case, the Run End log is not generated. It is not clear how to keep records for such runs
 +
 
 +
=Special Studies=
 +
Sweeper off test results:
 +
1. LD2, 12 uA, Strip chart: https://logbooks.jlab.org/entry/4210027
 +
2. LD2 Sweeper on: https://logbooks.jlab.org/entry/4209547
 +
3. LD2 Sweeper off: https://logbooks.jlab.org/entry/4209596
 +
4. Sweeper run 2272: https://logbooks.jlab.org/entry/4209605
  
 
= Planned Accesses to the Hall Today=
 
= Planned Accesses to the Hall Today=
  
 
= Planned Accelerator Configuration Changes =
 
= Planned Accelerator Configuration Changes =
* Pass change in Hall A on the 31th
+
* Pass change in Hall A on the 31st
  
 
= Special Requests =
 
= Special Requests =

Revision as of 00:25, 28 October 2023

= RC Meeting Information =https://hallcweb.jlab.org/wiki/index.php?title=October_26,_2023&action=edit

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Past 24 hours

Current Status

Current Run Plan

  • Continue production
  • Half wave plane change at 11 a.m.
  • Moller measurement starting 8:30 a.m., last Friday for the day shift.

Issues

  • Thanks to Bob's effort, the scalar is now displaying in between the runs. This is a significant time-saver especially during the part of the run plan when the PS needs to be changed every 20 minutes. (Thanks Bob)
  • DAQ seems to be able to handle 20% higher right, LD2 runs are currently running at 12 uA (instead of 10 uA from the previous day.)
  • 8pm, DAQ crashed in the middle of the run, Alex was contacted to the restoration. (Near future protocol on DAQ issues, Bob is the on-call for the DAQ issues).
  • 10 am, HMS Colimator GUI got stuck, reset procedure was attempted, and hall access was requested to manually reset the IOC: https://logbooks.jlab.org/entry/4209134
  • 23 pm, The HMS Q3 software interlock tripped, and lost current, the experience shifter was able to clear the interlock and resume production: https://logbooks.jlab.org/entry/4209643

A few new/raised concerns:

1. During the DAQ Coda configuration changes, the instruction is very unclear if a "RESET" procedure is needed. We need to make the wiki instructions clear on this part. Because of this ambiguity, we potentially might have lost 1 good run on this. 2. Part of the run plan requires changing setting, and beam current, frequently, as a result, the run sheets are not completely filled. 3. DAQ crashes during the run-ending process, in this case, the Run End log is not generated. It is not clear how to keep records for such runs

Special Studies

Sweeper off test results: 1. LD2, 12 uA, Strip chart: https://logbooks.jlab.org/entry/4210027 2. LD2 Sweeper on: https://logbooks.jlab.org/entry/4209547 3. LD2 Sweeper off: https://logbooks.jlab.org/entry/4209596 4. Sweeper run 2272: https://logbooks.jlab.org/entry/4209605

Planned Accesses to the Hall Today

Planned Accelerator Configuration Changes

  • Pass change in Hall A on the 31st

Special Requests