Jump to navigationJump to searchLine 40: | Line 40: | ||
= Near Future Plan = | = Near Future Plan = | ||
# We will postpone the Monday corrector coil beam steering test, to the next setting change, since the current setting doesn't require the corrector coil. | # We will postpone the Monday corrector coil beam steering test, to the next setting change, since the current setting doesn't require the corrector coil. | ||
− | # Wednesday, November 2, 7:30 a.m.: sweep the hall open for maintenance first thing in the morning. | + | # Wednesday, November 2, 7:30 a.m.: sweep the hall open for maintenance first thing in the morning. We will attempt the following maintenance items: |
− | We will attempt the following maintenance items: | ||
## NPS students will remove all PMTs + bases from column. Hall tech support is needed for this part. | ## NPS students will remove all PMTs + bases from column. Hall tech support is needed for this part. | ||
## NPS shielding installation if ready | ## NPS shielding installation if ready |
Revision as of 15:26, 29 October 2023
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting-house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMXdsUT09#success Meeting ID: 161 701 5555 Passcode: One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
Past 24 hours
Since the last update, we have been in the production phase. However, there were a few issues and downtime:
- SHMS Helium level reading glitch.
- NPS Chiller coolant and crystal zone back temperature sensor over the limit.
- A new trigger threshold is introduced based on Alex's suggestion.
The spokespersons jointly made decisions to take action to eliminate the above issues in future runnings.
Current Status
- Production with the newly reduced two-photon threshold.
Near Future Plan
- We will postpone the Monday corrector coil beam steering test, to the next setting change, since the current setting doesn't require the corrector coil.
- Wednesday, November 2, 7:30 a.m.: sweep the hall open for maintenance first thing in the morning. We will attempt the following maintenance items:
- NPS students will remove all PMTs + bases from column. Hall tech support is needed for this part.
- NPS shielding installation if ready
- Heidi is looking into the possibility of warming up the SHMS dipole. If feasible, SHMS dipole will be warmed up.
- Chandan and Dave Mac checking/maintaining will access and check the HMS hodoscope patch panel. to address this issue: https://logbooks.jlab.org/entry/4210267
- Aaron will push new code for the NPS chiller controller.
I am sure the maintenance list will grow as we get closer to Wednesday.
- Tuesday, October 31, 11:00 a.m.:
We will invite Vald to give an insight into the high radiation test results.
There will be a meeting tomorrow.
Special Studies
Sweeper off test results:
- Peter found HMS Central Momentum mismatch/Correction: https://logbooks.jlab.org/entry/4210756
Planned Accesses to the Hall Today
Planned Accelerator Configuration Changes
- Pass change in Hall A on the 31st