Difference between revisions of "October 31, 2023"
From HallCWiki
(Created page with "[https://hallcweb.jlab.org/wiki/index.php/RC_Daily_Meetings:_NPS Back to the previous page] <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting-hou...") |
m (Clarified the RC instructions link for the HWP (this will be copy pasted for each new meeting so wanted to clarify it)) |
||
(16 intermediate revisions by one other user not shown) | |||
Line 27: | Line 27: | ||
* [https://logbooks.jlab.org/book/hallc Hall-C Logbook] | * [https://logbooks.jlab.org/book/hallc Hall-C Logbook] | ||
* [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board] | * [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board] | ||
+ | |||
+ | = Instruction for RCs = | ||
+ | * [https://hallcweb.jlab.org/wiki/index.php/Hall_C_IHWP_Change_Procedure Half-wave plate change] | ||
+ | ** Follow the instructions in the link above whenever the HWP is changed flipped. | ||
+ | |||
= Past 24 hours = | = Past 24 hours = | ||
+ | Mostly smooth production. Good 24 hours. | ||
+ | Issues: | ||
+ | * Flipping script procedure falling through the crack caused large charge asymmetry for two hours, Hall C RC didn't follow the procedure: https://logbooks.jlab.org/entry/4212928 | ||
+ | ** Suggestions for the future | ||
+ | # Adding the charge asymmetry to the Hall C alarm handler. | ||
+ | # Making the instruction clear for the future Hall C RC on the half-wave plate change. (This information must be passed on). | ||
+ | * Popcorn alarm: https://logbooks.jlab.org/entry/4212784 | ||
+ | * Chiller average temperature: https://logbooks.jlab.org/entry/4212896 | ||
+ | * DAQ issue in the morning thanks to Chandan, Raydo, and Wasim for resolving it: https://logbooks.jlab.org/files/2023/10/4212913/nps_hms_coin_2458_50k.pdf | ||
+ | |||
+ | The plan is to data taking till 7:00 am Wednesday. | ||
= RC Summary = | = RC Summary = | ||
− | + | https://logbooks.jlab.org/entry/4212964 | |
= Current Status = | = Current Status = | ||
Line 38: | Line 54: | ||
= Near Future Plan = | = Near Future Plan = | ||
+ | Wednesday, November 2, during the beam study, the plan is the following: | ||
+ | * 7:00 beam stops. Rotate SHMS to 38 degrees. | ||
+ | * 7:30 a.m.: sweep the hall open for the restricted access. | ||
+ | * Hall will enter restricted access at 8:00-8:15 a.m., | ||
+ | * No time limit on closing the hall. | ||
+ | |||
+ | * We will attempt the following maintenance items: | ||
+ | ** Moving NPS to 6 meters. (from the target). Re-survey for radiation level with Radcon. 6m pin and 9m pin. | ||
+ | ** NPS students will remove Column 0: PMTs + bases. Hall tech support is needed for this part. | ||
+ | ** Two new bases with the low voltage regulator bypassed (verified) will be swapped into the NPS (column 0). | ||
+ | ** NPS shielding installation: large sheets of borated-polyethylene will be transferred from Hall A to C by Hall C tech. (3-4m NPS position), fixed to the rails. | ||
+ | ** After installing the shield, reconfirm SHMS angle limit. | ||
+ | ** Replace the NPS radiation monitoring dosimeters. (Mitch and others), 8 in column #0, 8 in cloumn #29. | ||
+ | ** LED troubleshooting. (Mitch) | ||
+ | ** Heidi is looking into adding an additional bandit to ensure SHMS dipole stability. | ||
+ | ** Chandan and Dave Mack will access and check the HMS hodoscope patch panel. to address this issue: https://logbooks.jlab.org/entry/4210267 | ||
+ | ** Aaron will push a new code for the NPS chiller controller. | ||
+ | ** Joe will guide a walk-through at 1 p.m. | ||
+ | ** Virtual machine reboot request from the computing center (Hanjie is coordinating this part) | ||
+ | ** Bob will take another look at the scaler server. | ||
+ | ** Simona will place some test samples into the Hall (not NPS-related). | ||
+ | ** Paolo for additional lead shielding, we need the holder. (expected to come in today in the afternoon). | ||
+ | |||
+ | In the near term future: | ||
+ | # Sometime in the future, we will invite Vald to give an insight into the high radiation test results. | ||
# We will perform a corrector coil beam steering test for the next angle setting with a non-zero corrector coil field. | # We will perform a corrector coil beam steering test for the next angle setting with a non-zero corrector coil field. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
= Special Studies = | = Special Studies = | ||
Line 56: | Line 87: | ||
= Planned Accelerator Configuration Changes = | = Planned Accelerator Configuration Changes = | ||
− | |||
= Special Requests = | = Special Requests = |
Latest revision as of 15:25, 31 October 2023
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting-house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMXdsUT09#success Meeting ID: 161 701 5555 Passcode: One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Contents
Useful Links
Instruction for RCs
- Half-wave plate change
- Follow the instructions in the link above whenever the HWP is changed flipped.
Past 24 hours
Mostly smooth production. Good 24 hours.
Issues:
- Flipping script procedure falling through the crack caused large charge asymmetry for two hours, Hall C RC didn't follow the procedure: https://logbooks.jlab.org/entry/4212928
- Suggestions for the future
- Adding the charge asymmetry to the Hall C alarm handler.
- Making the instruction clear for the future Hall C RC on the half-wave plate change. (This information must be passed on).
- Popcorn alarm: https://logbooks.jlab.org/entry/4212784
- Chiller average temperature: https://logbooks.jlab.org/entry/4212896
- DAQ issue in the morning thanks to Chandan, Raydo, and Wasim for resolving it: https://logbooks.jlab.org/files/2023/10/4212913/nps_hms_coin_2458_50k.pdf
The plan is to data taking till 7:00 am Wednesday.
RC Summary
https://logbooks.jlab.org/entry/4212964
Current Status
Near Future Plan
Wednesday, November 2, during the beam study, the plan is the following:
- 7:00 beam stops. Rotate SHMS to 38 degrees.
- 7:30 a.m.: sweep the hall open for the restricted access.
- Hall will enter restricted access at 8:00-8:15 a.m.,
- No time limit on closing the hall.
- We will attempt the following maintenance items:
- Moving NPS to 6 meters. (from the target). Re-survey for radiation level with Radcon. 6m pin and 9m pin.
- NPS students will remove Column 0: PMTs + bases. Hall tech support is needed for this part.
- Two new bases with the low voltage regulator bypassed (verified) will be swapped into the NPS (column 0).
- NPS shielding installation: large sheets of borated-polyethylene will be transferred from Hall A to C by Hall C tech. (3-4m NPS position), fixed to the rails.
- After installing the shield, reconfirm SHMS angle limit.
- Replace the NPS radiation monitoring dosimeters. (Mitch and others), 8 in column #0, 8 in cloumn #29.
- LED troubleshooting. (Mitch)
- Heidi is looking into adding an additional bandit to ensure SHMS dipole stability.
- Chandan and Dave Mack will access and check the HMS hodoscope patch panel. to address this issue: https://logbooks.jlab.org/entry/4210267
- Aaron will push a new code for the NPS chiller controller.
- Joe will guide a walk-through at 1 p.m.
- Virtual machine reboot request from the computing center (Hanjie is coordinating this part)
- Bob will take another look at the scaler server.
- Simona will place some test samples into the Hall (not NPS-related).
- Paolo for additional lead shielding, we need the holder. (expected to come in today in the afternoon).
In the near term future:
- Sometime in the future, we will invite Vald to give an insight into the high radiation test results.
- We will perform a corrector coil beam steering test for the next angle setting with a non-zero corrector coil field.
Special Studies
- Peter found HMS Central Momentum mismatch/Correction: https://logbooks.jlab.org/entry/4210756