(Created page with "= RC Meeting Information = <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> * Zoom remote connection informa...")
 
Line 29: Line 29:
 
* All shifts should come in as planned.
 
* All shifts should come in as planned.
 
* Heidi on vacation 7-13 Dec. Contact Steve L for cryo during that time.
 
* Heidi on vacation 7-13 Dec. Contact Steve L for cryo during that time.
* cc Heidi on any cryo logbook entry (fansler@jlab.org)
+
** cc Heidi on any cryo logbook entry (fansler@jlab.org)
 +
* Physically verify green led of gas flow and BCM temps in electronics room
  
 
= Current Issues =
 
= Current Issues =

Revision as of 09:00, 7 December 2023

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Current Status

  • Moller Measurement yesterday, polarization = 86%
    • Beam recovery after Moller (mostly) smooth
    • Required MCC to reboot an ioc. This caused reboot of MCC ioc's
    • HMS Chamber 2V1 recovery slow (lingering structure in drift distance plot)
      • Chose to take 2 hour cosmic
    • Returned to run plan on LD2


Current Run Plan

Notices in Effect for Shift Crew

  • All shifts should come in as planned.
  • Heidi on vacation 7-13 Dec. Contact Steve L for cryo during that time.
    • cc Heidi on any cryo logbook entry (fansler@jlab.org)
  • Physically verify green led of gas flow and BCM temps in electronics room

Current Issues

  • On call list seems incomplete and should be addressed by the Hall: https://logbooks.jlab.org/entry/4230495
  • We need other indications of this interlock. In Hall A, we have it shut off detector HV via the alarm handler, and we have a flow rate alarm. Seems the useful PV values have not been working since 1-Sept.
  • NPS PMT/Base failures are propagating into columns 9 & 10

Planned Access to the Hall

Planned Accelerator Configuration Changes

Special Requests