= Current Status =
 
= Current Status =
 
* Production on KinC_x60_2 and _2'.   
 
* Production on KinC_x60_2 and _2'.   
 +
** 21.81 ABU in last 24 hours (Day+Swing+Owl)
 
* Saturday 09 Dec: 07:00-09:00 Separator repair work.  Beam restored to HallC ~ 09:30
 
* Saturday 09 Dec: 07:00-09:00 Separator repair work.  Beam restored to HallC ~ 09:30
 
* Sunday 10 Dec:  HMS Q3 & Dipole tripped at 11:19 (run 3510) Restored directed to set points (Run 3511, 3512)  Ramped to MOL and back to set point at 14:00
 
* Sunday 10 Dec:  HMS Q3 & Dipole tripped at 11:19 (run 3510) Restored directed to set points (Run 3511, 3512)  Ramped to MOL and back to set point at 14:00
Line 24: Line 25:
 
** cycle  KinC_x60_2 then  KinC_x60_2'
 
** cycle  KinC_x60_2 then  KinC_x60_2'
 
** Only need four 1-hour production runs on LD2 for each cycle of each setting.
 
** Only need four 1-hour production runs on LD2 for each cycle of each setting.
 +
* Suggestions for rest of week
 +
** Eliminate coin_sparse ps3=0 runs (we have enough data on electron efficiency)
 +
** Keep coin_sparse ps4=0 runs (DIS cross section)
 +
** Eliminate coin_sparse_low runs (we have enough data to study)
 +
** Reduce max current on LD2 at KinC_x60_2' (NPS 12.4 deg) to 15 uAmp
 +
*** NPS_Trig1 = 3MHz, hTRIG1 = 2.6 MHz at 20 uAmp
 +
*** https://logbooks.jlab.org/entry/4233214
  
 
= Notices in Effect for Shift Crew =
 
= Notices in Effect for Shift Crew =
Line 35: Line 43:
 
* On call list seems incomplete and should be addressed by the Hall: https://logbooks.jlab.org/entry/4230495
 
* On call list seems incomplete and should be addressed by the Hall: https://logbooks.jlab.org/entry/4230495
 
* We need other indications of this interlock. In Hall A, we have it shut off detector HV via the alarm handler, and we have a flow rate alarm. Seems the useful PV values have not been working since 1-Sept.
 
* We need other indications of this interlock. In Hall A, we have it shut off detector HV via the alarm handler, and we have a flow rate alarm. Seems the useful PV values have not been working since 1-Sept.
 +
* Need alarm on NPS Sweep (or improved visual display of status).
 
* NPS PMT/Base failures are propagating into columns  12, 13
 
* NPS PMT/Base failures are propagating into columns  12, 13
* Calo Temp sensor interface failed yesterday around 16:30. 
+
* Reduce LD2 current at KinC_x60_2' to 15 uA
** Remote restart by Aaron Brown not successful
 
** Access to Hall, Unplugged and replugged AC power https://logbooks.jlab.org/entry/4232489
 
** Beam recovery took another ~2 hours
 
  
  
  
 
= Planned Access to the Hall =
 
= Planned Access to the Hall =
*  perhaps opportunistic access Monday to disconnect some noisy signal cables to FADC from empty channels.
 
  
 
= Planned Accelerator Configuration Changes =
 
= Planned Accelerator Configuration Changes =
Line 57: Line 62:
 
* Moller Dec 13  
 
* Moller Dec 13  
 
* Ohio University has delivered 88 new bases, ready for installation (with LV regulators)
 
* Ohio University has delivered 88 new bases, ready for installation (with LV regulators)
** Do we want to replace column 16 with regulated bases (allow 3.5 V operation on columns 16-19)
+
# Shutdown repair options
 +
## Replace columns 0-15 with jumpered bases
 +
### Fastest option, but leaves columns 16++ vulnerable to base failure
 +
## Replace columns 0-15 with jumpered bases, replace columns 16,17 with new bases with new regulators (from Ohio)
 +
### A little more shutdown time in Jan.  Keeps consistent 3.5V on columns 16-19
 +
## Remove columns 0-19, start restoration at column 19
 +
### Best option for radiation damage.
 +
### Either extend shutdown beyond Jan 20 to restore all columns
 +
### Or:  only restore colulmns 4-19
 +
 
 
* What is our NPS Shutdown Checklist for Dec 22-Jan 2 SAD?
 
* What is our NPS Shutdown Checklist for Dec 22-Jan 2 SAD?
 +
** Turn off HMS magnets (Dec 15)
 +
** Turn off HMS detector HV (Dec 15)
 +
** Dec 22
 +
*** Turn off NPS HV
 +
*** Turn off NPS LV
 +
*** Turn off NPS Chiller
 
* Calorimeter energy resolution studies
 
* Calorimeter energy resolution studies
 
** Analyze pi0 mass resolution as a function of pi0 energy
 
** Analyze pi0 mass resolution as a function of pi0 energy
 
** Analyze pi0 mass resolution separately for high current and low current runs
 
** Analyze pi0 mass resolution separately for high current and low current runs

Latest revision as of 10:53, 12 December 2023

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Current Status

  • Production on KinC_x60_2 and _2'.
    • 21.81 ABU in last 24 hours (Day+Swing+Owl)
  • Saturday 09 Dec: 07:00-09:00 Separator repair work. Beam restored to HallC ~ 09:30
  • Sunday 10 Dec: HMS Q3 & Dipole tripped at 11:19 (run 3510) Restored directed to set points (Run 3511, 3512) Ramped to MOL and back to set point at 14:00

Current Run Plan

  • Continue run plan: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan
    • cycle KinC_x60_2 then KinC_x60_2'
    • Only need four 1-hour production runs on LD2 for each cycle of each setting.
  • Suggestions for rest of week
    • Eliminate coin_sparse ps3=0 runs (we have enough data on electron efficiency)
    • Keep coin_sparse ps4=0 runs (DIS cross section)
    • Eliminate coin_sparse_low runs (we have enough data to study)
    • Reduce max current on LD2 at KinC_x60_2' (NPS 12.4 deg) to 15 uAmp

Notices in Effect for Shift Crew

  • All shifts should come in as planned.
  • Heidi on vacation 7-13 Dec. Contact Steve L for cryo during that time.
    • cc Heidi & Steve Lassiter on any cryo logbook entry (fansler@jlab.org, lassiter@jlab.org)
  • Physically verify green led of gas flow and BCM temps in electronics room
  • Record HMS (electron) tracking efficiency from each 50K replay report

Current Issues

  • On call list seems incomplete and should be addressed by the Hall: https://logbooks.jlab.org/entry/4230495
  • We need other indications of this interlock. In Hall A, we have it shut off detector HV via the alarm handler, and we have a flow rate alarm. Seems the useful PV values have not been working since 1-Sept.
  • Need alarm on NPS Sweep (or improved visual display of status).
  • NPS PMT/Base failures are propagating into columns 12, 13
  • Reduce LD2 current at KinC_x60_2' to 15 uA


Planned Access to the Hall

Planned Accelerator Configuration Changes

  • We will run until 07:00 Dec 15.
    • Target will be warmed up and parked.
    • Hall will remain in Controlled Access until 07:00 Dec 19
    • Beam studies (Day Shift) Dec 19 will send beam into hall
    • Hall will return to Controlled Access at 16:00 on Dec 19

Special Requests

  • BCM Calibration today
  • Moller Dec 13
  • Ohio University has delivered 88 new bases, ready for installation (with LV regulators)
  1. Shutdown repair options
    1. Replace columns 0-15 with jumpered bases
      1. Fastest option, but leaves columns 16++ vulnerable to base failure
    2. Replace columns 0-15 with jumpered bases, replace columns 16,17 with new bases with new regulators (from Ohio)
      1. A little more shutdown time in Jan. Keeps consistent 3.5V on columns 16-19
    3. Remove columns 0-19, start restoration at column 19
      1. Best option for radiation damage.
      2. Either extend shutdown beyond Jan 20 to restore all columns
      3. Or: only restore colulmns 4-19
  • What is our NPS Shutdown Checklist for Dec 22-Jan 2 SAD?
    • Turn off HMS magnets (Dec 15)
    • Turn off HMS detector HV (Dec 15)
    • Dec 22
      • Turn off NPS HV
      • Turn off NPS LV
      • Turn off NPS Chiller
  • Calorimeter energy resolution studies
    • Analyze pi0 mass resolution as a function of pi0 energy
    • Analyze pi0 mass resolution separately for high current and low current runs