(Created page with "= RC Meeting Information = <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> * Zoom connection link: https://...")
 
Line 15: Line 15:
 
* [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board]
 
* [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board]
 
* [https://hallcweb.jlab.org/wiki/index.php/RC_Daily_Meetings:_NPS Daily RC Reports]
 
* [https://hallcweb.jlab.org/wiki/index.php/RC_Daily_Meetings:_NPS Daily RC Reports]
 +
 +
= Hall status =
 +
* NPS column 24,25 initial repairs done
 +
* Cosmic data check showed a few channels need to be fixed https://logbooks.jlab.org/entry/4255522
 +
 +
* Summary of work done during the access:
 +
** NPS work summary (https://logbooks.jlab.org/entry/4255429, https://logbooks.jlab.org/entry/4255443), thank you all for your hard work!
 +
** SHMS encoder investigation (https://logbooks.jlab.org/entry/4255365)
 +
** MQF3M01 water flow check (https://logbooks.jlab.org/entry/4255338)
  
 
= Accelerator status =
 
= Accelerator status =
Line 21: Line 30:
  
 
= Current Run Plan =  
 
= Current Run Plan =  
* Continue run plan: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan
+
* Short-term run plan: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan
 
** KinC_x36_6  
 
** KinC_x36_6  
 
** Spectrometer momentum and angles have been set for the kinematics. NPS angle is set to 7.5 deg instead of 7.4 (could only achieved SHMS angle to 23.8 deg https://logbooks.jlab.org/entry/4255364)
 
** Spectrometer momentum and angles have been set for the kinematics. NPS angle is set to 7.5 deg instead of 7.4 (could only achieved SHMS angle to 23.8 deg https://logbooks.jlab.org/entry/4255364)

Revision as of 10:25, 23 February 2024

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Hall status

Accelerator status

  • Hall B taking beam
  • Maintenance + Beam study next Wednesday

Current Run Plan

Notices in Effect for Shift Crew

Current Issues

  • NPS crate #2 drops occasionally: Ben had a closer look at the runs with the issue. He thinks that it might be because npsvtp1 clustering was messed up, and this causes a problem for the FADC readout mask logic. Ben will check if a firmware update could help eliminating some of the problem.

Planned Access to the Hall

Special Requests

  • Guard house work from next Monday. Pay attention to the sign and follow the directions around there when coming to the accelerator site.