= Hall status =  
+
= Summary =  
* Completed Carbon DIS data taking
 
* Completed two cycles of Positron data taking
 
  
* Controlled access from 9am this morning
+
'''Yesterday (02/28)''' was the Maintenance Day during the '''Day shift''' (https://logbooks.jlab.org/entry/4258304) and during '''Swing''' accelerator did some beam studies (https://logbooks.jlab.org/entry/4258458). The beam was restored to the Halls late '''Swing''' and we proceeded back to production. We took Dummy runs and then switched to LD2 for the night. Hall B performed the Moller measurements at the end of the '''Swing shift''' and then changed IHWP from OUT to IN, after which we ran the flipper script.
** Planned work: https://logbooks.jlab.org/entry/4258144
 
  
* Hall needs to be back to beam permit for the last part of the beam study (~around 3-4pm).
+
We are currently at KinC_x36_6 (NPS Calorimeter at 6.0 m) and going to stay at this kinematics for the next few days. Data taking was smooth overnight without major issues.
  
* MCC will give us 1h heads up before they need the Hall C in beam permit
+
Swing shift summary (https://logbooks.jlab.org/entry/4258334).
  
= Accelerator status =
+
Owl shift summary (https://logbooks.jlab.org/entry/4258486).
* Maintenance + Beam study (https://logbooks.jlab.org/entry/4258072)
+
 
** Beam off at 7am
+
We will have an RC meeting today at 11 a.m.  
** Maintenance till around noon
 
** Beam study till 19:30pm
 
** Beam to the halls, ~21:00pm
 
** Scheduled can be shifted a bit depending on how things go..
 
  
 
= Planned Access to the Hall =
 
= Planned Access to the Hall =
  
* https://logbooks.jlab.org/entry/4258144
+
Julie wants to make an access to repair two NPS channels. The hall survey is scheduled for 1pm.
* NPS: Julie, Josh, Aaron to look at the temperature read back issue
 
* Heidi: checking Dipole (----> DONE)
 
* Hanjie, Alexandre: checking NPS crate fans (---> DONE)
 
* Larry, Jerry, Bob: Pumping SHMS magnets
 
* Bill: SHMS hut temperature sensor --> DONE; Summary: https://logbooks.jlab.org/entry/4258173
 
* Walk-thru at 1pm: Joe + 5 FIU students (6 keys)
 
* Facilities: lowering AC set point to 65F (---> DONE)
 
  
 +
= Accelerator =
  
* Other work planned during the downtime
+
RF would like to do two things this afternoon to zone 1L24. Replace the HPA controller and a solenoid controller. Both jobs can occur at the same time. Estimate is ~2hrs, including recovering the energy but could be less. Currently the North Linac trip rate is 28 trips/shift. Recovering the two cavities should take it down to 18-16 trips/shift. The work is planned to start at ~1:30pm-2:00pm.
** Ellen and Heidi: updating magnet software
 
** Hanjie will use the DAQ (will notify the shift crew before/after she is done)
 
  
 
= Current Run Plan =  
 
= Current Run Plan =  
Line 60: Line 45:
 
* NPS position for the next kinematics setting:
 
* NPS position for the next kinematics setting:
 
** 5m vs 6m: https://logbooks.jlab.org/entry/4258150
 
** 5m vs 6m: https://logbooks.jlab.org/entry/4258150
 
 
= Notices in Effect for Shift Crew =
 
* IHWP change instruction: https://hallcweb.jlab.org/wiki/index.php/Hall_C_IHWP_Change_Procedure
 
* BTA with low current - https://logbooks.jlab.org/entry/4256075
 
** Helper script: go_bta_config
 
  
 
= Current Issues =
 
= Current Issues =
* NPS crate #2 drops occasionally
 
** Not much reported recently, taking 30min runs (restarting a new run more often) seems helping
 
* NPS crate temperatures
 
  
= Special Requests =
+
* Hanjie was concerned that some NPS crates have relatively higher fan temperatures (~95F). We put box fans for those crates. We also asked Facilities if they can lower the AC set point from 68F to 65F (was done yesterday).
* Guard house work till Friday. Pay attention to the sign and follow the directions around there when coming to the accelerator site.
+
 +
= Future plans =
 +
* Monday (03/04): Sweeper wings off (Walter).
 +
* Monday (03/04): Spectrometer rotations: To be done after taking the Wings off. HMS-SHMS separation needs to be certified in the hall (Steve L).
 +
* Moller measurement next week (probably Tuesday)

Latest revision as of 11:10, 29 February 2024

Back to the calendar

RC Meeting Information

Current RC: Iuliia Skorodumina

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Summary

Yesterday (02/28) was the Maintenance Day during the Day shift (https://logbooks.jlab.org/entry/4258304) and during Swing accelerator did some beam studies (https://logbooks.jlab.org/entry/4258458). The beam was restored to the Halls late Swing and we proceeded back to production. We took Dummy runs and then switched to LD2 for the night. Hall B performed the Moller measurements at the end of the Swing shift and then changed IHWP from OUT to IN, after which we ran the flipper script.

We are currently at KinC_x36_6 (NPS Calorimeter at 6.0 m) and going to stay at this kinematics for the next few days. Data taking was smooth overnight without major issues.

Swing shift summary (https://logbooks.jlab.org/entry/4258334).

Owl shift summary (https://logbooks.jlab.org/entry/4258486).

We will have an RC meeting today at 11 a.m.

Planned Access to the Hall

Julie wants to make an access to repair two NPS channels. The hall survey is scheduled for 1pm.

Accelerator

RF would like to do two things this afternoon to zone 1L24. Replace the HPA controller and a solenoid controller. Both jobs can occur at the same time. Estimate is ~2hrs, including recovering the energy but could be less. Currently the North Linac trip rate is 28 trips/shift. Recovering the two cavities should take it down to 18-16 trips/shift. The work is planned to start at ~1:30pm-2:00pm.

Current Run Plan

Current Issues

  • Hanjie was concerned that some NPS crates have relatively higher fan temperatures (~95F). We put box fans for those crates. We also asked Facilities if they can lower the AC set point from 68F to 65F (was done yesterday).

Future plans

  • Monday (03/04): Sweeper wings off (Walter).
  • Monday (03/04): Spectrometer rotations: To be done after taking the Wings off. HMS-SHMS separation needs to be certified in the hall (Steve L).
  • Moller measurement next week (probably Tuesday)