Difference between revisions of "March 14, 2024"

From HallCWiki
Jump to navigationJump to search
(Created page with "[https://hallcweb.jlab.org/wiki/index.php/RC_Daily_Meetings:_NPS Back to the calendar] = RC Meeting Information = <b> RC Daily Meetings are at 11:00 (am) via Zoom and in per...")
 
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
  
 
= RC Meeting Information =
 
= RC Meeting Information =
 +
Current RC: Rachel Montgomery (rmontgom@jlab.org)
  
 
<b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b>
 
<b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b>
Line 29: Line 30:
  
 
= Run Plan =  
 
= Run Plan =  
* We are cycling KinC_x50_0a and KinC_x50_0b production.
+
* We are cycling KinC_x50_0a and KinC_x50_0b production. We're on the first cycle of the KinC_x50_0 short term run plan.
 +
* We resumed production during swing 13th March on KinC_x50_0a - step 1.3 - LD2 target, and the 5th (of sixteen) 30min runs with 15uA, ps4=0.
 +
* Since then the LD2 for KinC_x50_0a was completed and now the day shift crew are a few runs into the LH2 running for KinC_x50_0b
 +
 
 
* How do we want to fit in positron runs (if needed)?
 
* How do we want to fit in positron runs (if needed)?
* Do we want to request access to work on NPS
+
* Do we want to request some days worth of access to work on NPS?
  
 
= Requests for shift crew =  
 
= Requests for shift crew =  

Latest revision as of 09:51, 19 March 2024

Back to the calendar

RC Meeting Information

Current RC: Rachel Montgomery (rmontgom@jlab.org)

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Summary

RC update 14th March: https://logbooks.jlab.org/entry/4266651

Planned Access to the Hall

Currently no planned access

Accelerator

Current schedule: Hall D stops running Friday Lunch time. Hall B then comes up. Next Wed 20th March is for beam studies.

Run Plan

  • We are cycling KinC_x50_0a and KinC_x50_0b production. We're on the first cycle of the KinC_x50_0 short term run plan.
  • We resumed production during swing 13th March on KinC_x50_0a - step 1.3 - LD2 target, and the 5th (of sixteen) 30min runs with 15uA, ps4=0.
  • Since then the LD2 for KinC_x50_0a was completed and now the day shift crew are a few runs into the LH2 running for KinC_x50_0b
  • How do we want to fit in positron runs (if needed)?
  • Do we want to request some days worth of access to work on NPS?

Requests for shift crew

  • Please be sure to make screen shots as prompted in the run plan, eg first run of each new target cycle snapshot NPS scalers/anode currents, trigger rates, CODA data rate/livetime/event rate, as prompted in the run plan and of anything else appropriate that happens on shift (e.g. NPS sweeper and corrector settings)

Shift schedule

Please sign up for swing SL this Sunday March 17th if you can. There are also gaps in SL in the days following that.