Difference between revisions of "March 26, 2024"

From HallCWiki
Jump to navigationJump to search
 
(One intermediate revision by the same user not shown)
Line 20: Line 20:
 
*HMS DC Gas flow: -15 V power supply replaced with SHMS Cherenkov unit
 
*HMS DC Gas flow: -15 V power supply replaced with SHMS Cherenkov unit
 
*Hall C technicians drilled new hole at 3.5 meters
 
*Hall C technicians drilled new hole at 3.5 meters
** Survey of 3.5 and 9(?) meters will be preformed tomorrow
+
** Survey of 3.5 and 9.5 meters will be preformed tomorrow
 +
 
 +
=Plans=
 +
*Replacement of VIP3H04: https://logbooks.jlab.org/entry/4271073
 +
*Site tour: There isn't an itinerary yet about the expected time in Hall C.
 +
** PD expects the tour to begin around 11 am.

Latest revision as of 10:25, 26 March 2024

RC Meeting Information

Current RC: Michael Nycz (mnycz@jlab.org)

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Summary

  • Preparation to move magnet from NE spreader ~ 90% (as of 8 am)
  • Replacement vacuum chamber has been leaked checked
  • HMS DC Gas flow: -15 V power supply replaced with SHMS Cherenkov unit
  • Hall C technicians drilled new hole at 3.5 meters
    • Survey of 3.5 and 9.5 meters will be preformed tomorrow

Plans