Difference between revisions of "Oct 08 2024"

From HallCWiki
Jump to navigationJump to search
(Created page with "Back to Main Page >> Weekly meetings == Agenda == == Notes ==")
 
Line 4: Line 4:
  
 
== Notes ==
 
== Notes ==
 +
Updates:
 +
# Both HMS and SHMS DAQ are ready to take cosmic runs
 +
# HMS cosmic looks good (FADC uses Hall D firmware)
 +
# SHMS cosmic TDC and DC look good, but the replay root files don't have FADC events (Hall B firmware), could be the decoder is not set up correctly to decode Hall B firmware
 +
# RHEL9 upgrade preparation is on-going
 +
# Checked with Chris Cuevas: SOLID FADC will probably be available by end of November, and he should have enough SD boards for us now.

Revision as of 15:03, 9 October 2024

Back to Main Page >> Weekly meetings

Agenda

Notes

Updates:

  1. Both HMS and SHMS DAQ are ready to take cosmic runs
  2. HMS cosmic looks good (FADC uses Hall D firmware)
  3. SHMS cosmic TDC and DC look good, but the replay root files don't have FADC events (Hall B firmware), could be the decoder is not set up correctly to decode Hall B firmware
  4. RHEL9 upgrade preparation is on-going
  5. Checked with Chris Cuevas: SOLID FADC will probably be available by end of November, and he should have enough SD boards for us now.