Difference between revisions of "Oct 08 2024"
From HallCWiki
Jump to navigationJump to search (→Notes) |
|||
(2 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
Back to [[LAD_wiki|Main Page]] >> [[Weekly_meetings |Weekly meetings]] | Back to [[LAD_wiki|Main Page]] >> [[Weekly_meetings |Weekly meetings]] | ||
== Agenda == | == Agenda == | ||
− | + | # [https://hallcweb.jlab.org/wiki/images/9/96/LAD_Cablelayout.pdf Trigger v0.2] -- Florian | |
== Notes == | == Notes == | ||
Line 10: | Line 10: | ||
# RHEL9 upgrade preparation is on-going | # RHEL9 upgrade preparation is on-going | ||
# Checked with Chris Cuevas: SOLID FADC will probably be available by end of November, and he should have enough SD boards for us now. | # Checked with Chris Cuevas: SOLID FADC will probably be available by end of November, and he should have enough SD boards for us now. | ||
+ | # LAD will run with 1 uA for production, and (>)5 uA for optics (SHMS+HMS) |
Latest revision as of 09:15, 10 October 2024
Back to Main Page >> Weekly meetings
Agenda
- Trigger v0.2 -- Florian
Notes
Updates:
- Both HMS and SHMS DAQ are ready to take cosmic runs
- HMS cosmic looks good (FADC uses Hall D firmware)
- SHMS cosmic TDC and DC look good, but the replay root files don't have FADC events (Hall B firmware), could be the decoder is not set up correctly to decode Hall B firmware
- RHEL9 upgrade preparation is on-going
- Checked with Chris Cuevas: SOLID FADC will probably be available by end of November, and he should have enough SD boards for us now.
- LAD will run with 1 uA for production, and (>)5 uA for optics (SHMS+HMS)