Difference between revisions of "Oct 08 2024"

From HallCWiki
Jump to navigationJump to search
 
Line 1: Line 1:
 
Back to [[LAD_wiki|Main Page]] >> [[Weekly_meetings |Weekly meetings]]
 
Back to [[LAD_wiki|Main Page]] >> [[Weekly_meetings |Weekly meetings]]
 
== Agenda ==
 
== Agenda ==
# Trigger v0.2 -- Florian
+
# [https://hallcweb.jlab.org/wiki/images/9/96/LAD_Cablelayout.pdf Trigger v0.2] -- Florian
  
 
== Notes ==
 
== Notes ==

Latest revision as of 09:15, 10 October 2024

Back to Main Page >> Weekly meetings

Agenda

  1. Trigger v0.2 -- Florian

Notes

Updates:

  1. Both HMS and SHMS DAQ are ready to take cosmic runs
  2. HMS cosmic looks good (FADC uses Hall D firmware)
  3. SHMS cosmic TDC and DC look good, but the replay root files don't have FADC events (Hall B firmware), could be the decoder is not set up correctly to decode Hall B firmware
  4. RHEL9 upgrade preparation is on-going
  5. Checked with Chris Cuevas: SOLID FADC will probably be available by end of November, and he should have enough SD boards for us now.
  6. LAD will run with 1 uA for production, and (>)5 uA for optics (SHMS+HMS)