Difference between revisions of "Dec 10 2024"
From HallCWiki
Jump to navigationJump to search (Created page with "Back to Main Page >> Weekly meetings == Agenda == == Notes ==") |
(→Notes) |
||
Line 4: | Line 4: | ||
== Notes == | == Notes == | ||
+ | # GEM tests are going on in the test lab, probably won't be moved to the hall until January; waiting for a bracket for GEM foil tension etc. | ||
+ | # Bill and Hanjie are running fibers for TI and network switch from the SHMS hut to the LAD bunker | ||
+ | # One LAD Panel is tested in the hall and installed: SHMS needs to be moved to a smaller angle because of the LAD panel holding bars too close to the SHMS; the holding bars won't be there once the installation is complete. | ||
+ | # Need to run 3 LEMO cables between the SHMS hut and LAD bunker: two LAD triggers, EDTM; Bill will run 4 cables | ||
+ | # One more panel would be moved to the hall next week | ||
+ | # V1495 for LAD trigger is ready, 5 vmeDSC boards are ready |
Latest revision as of 15:10, 11 December 2024
Back to Main Page >> Weekly meetings
Agenda
Notes
- GEM tests are going on in the test lab, probably won't be moved to the hall until January; waiting for a bracket for GEM foil tension etc.
- Bill and Hanjie are running fibers for TI and network switch from the SHMS hut to the LAD bunker
- One LAD Panel is tested in the hall and installed: SHMS needs to be moved to a smaller angle because of the LAD panel holding bars too close to the SHMS; the holding bars won't be there once the installation is complete.
- Need to run 3 LEMO cables between the SHMS hut and LAD bunker: two LAD triggers, EDTM; Bill will run 4 cables
- One more panel would be moved to the hall next week
- V1495 for LAD trigger is ready, 5 vmeDSC boards are ready