Difference between revisions of "Elong-15-03-26"
From HallCWiki
Jump to navigationJump to search (New page: =11 GeV Beam= Based on discussions with Mark and Gerry, I redid the rates using a differently-binned 11 GeV bin to increase nu and <math>W_{NN}^2= 2q_0 m_D+m_D^2 -Q^2</math>, as there was...) |
(→t20) |
||
Line 9: | Line 9: | ||
Using the Bosted code, I calculated first preliminary estimates for t20. | Using the Bosted code, I calculated first preliminary estimates for t20. | ||
− | [[Image:2015-03-26-t20.png]] | + | [[Image:2015-03-26-t20.png|600px]] |
Revision as of 14:23, 26 March 2015
11 GeV Beam
Based on discussions with Mark and Gerry, I redid the rates using a differently-binned 11 GeV bin to increase nu and <math>W_{NN}^2= 2q_0 m_D+m_D^2 -Q^2</math>, as there was concern about the curves not being valid for low nu~0.5 GeV. W was replaced with W_NN, and the dotted line shows <math>W_{NN}=m_D+50</math> MeV.
t20
Using the Bosted code, I calculated first preliminary estimates for t20.