Difference between revisions of "Wednesday, May 3, 2017"
From HallCWiki
Jump to navigationJump to search (New page: == Meeting Information == * Location CC L210A, 11 am * [https://hallcweb.jlab.org/doc-private/DocumentDatabase DocDB] === Blue Jeans Connection Information === * https://bluejeans.com/895...) |
|||
(5 intermediate revisions by 2 users not shown) | |||
Line 14: | Line 14: | ||
== Agenda == | == Agenda == | ||
+ | # [https://hallcweb.jlab.org/doc-private/ShowDocument?docid=854 Document] on helium limits for PMTs by Dave Mack. | ||
+ | # Triggers required for the upcoming experiments | ||
+ | # Commissioning plan updates from detector systems | ||
# Status update from detector owners, calibrations, efficiencies, etc. | # Status update from detector owners, calibrations, efficiencies, etc. | ||
# Review systems owners and update information | # Review systems owners and update information | ||
− | |||
# Address system specific points of interest for the Fall 2017 run | # Address system specific points of interest for the Fall 2017 run | ||
Line 23: | Line 25: | ||
=== General === | === General === | ||
− | + | * Dave M. showed [https://hallcweb.jlab.org/doc-private/ShowDocument?docid=854 some slides] regarding helium contamination in Hall C and it's effect on PMT's installed in the Hall | |
− | + | * 2.2 and 6.6 GeV is needed for detector, optics, and acceptance checkout during the Fall 2017 commissioning run | |
− | + | * We have 1 week to perform the commissioning | |
− | + | ** There is no time to take our time with performing checkouts | |
− | + | ** Everything that is required to perform the checkouts needs to be available and planned out prior to commissioning | |
+ | * We need to develop a plan for measuring the trigger efficiencies | ||
+ | * The trigger/DAQ configuration requirements for the upcoming experiments need to be provided as soon as possible to the trigger/DAQ group | ||
+ | * Preliminary commissioning plans have been requested from each of the individual detector groups by next meeting | ||
=== Beam Line === | === Beam Line === | ||
− | + | * The super harps have been pulled from the Hall to be re-fiducialized | |
+ | * Dave G. contacted John and Kieth regarding the bug BPMs | ||
+ | ** They had the wrong sign during the Spring 2017 KPP run | ||
+ | ** This was known since work was being done on the electronics and software side | ||
+ | * The known helium leak in the dump that was discovered during the KPP run is being investigated | ||
+ | ** The leak limits the current that can be delivered into the Hall and must be resolved prior to the Fall commissioning run | ||
+ | * The leak cannot be observed now however, the helium flow has just been restored so they will check again after some time has elapsed | ||
+ | * Everything else in the beam line appears to be good to go | ||
=== Trigger/DAQ === | === Trigger/DAQ === | ||
− | + | * The electronic dead time measurement is currently roughed in although it needs to be checked throughly | |
− | + | **Richard Mohring's [https://misportal.jlab.org/ul/publications/view_pub.cfm?pub_id=5403 thesis] was mentioned | |
=== HMS === | === HMS === | ||
Line 42: | Line 54: | ||
==== 6 GeV Drift Chambers ==== | ==== 6 GeV Drift Chambers ==== | ||
− | + | * No update provided | |
==== 12 GeV Drift Chambers ==== | ==== 12 GeV Drift Chambers ==== | ||
− | + | * Students will become available some time in the next couple of weeks | |
+ | ** Once available, work will resume | ||
==== Hodoscopes ==== | ==== Hodoscopes ==== | ||
− | + | * No update provided | |
==== Aerogel ==== | ==== Aerogel ==== | ||
− | + | * No update provided | |
− | |||
==== Heavy Gas Cherenkov ==== | ==== Heavy Gas Cherenkov ==== | ||
− | + | * No update provided | |
− | |||
==== Shower ==== | ==== Shower ==== | ||
=== SHMS === | === SHMS === | ||
+ | |||
+ | * No update provided | ||
==== GEM ==== | ==== GEM ==== | ||
− | + | * No update provided | |
==== Nobel Gas Cherenkov ==== | ==== Nobel Gas Cherenkov ==== | ||
− | + | * No update provided | |
==== Drift Chambers ==== | ==== Drift Chambers ==== | ||
− | + | * No update provided | |
==== Hodoscopes ==== | ==== Hodoscopes ==== | ||
− | + | * Simona provided a nice update, more details to follow... | |
==== Heavy Gas Cherenkov ==== | ==== Heavy Gas Cherenkov ==== | ||
− | + | * No update provided | |
==== Aerogel Cerenkov ==== | ==== Aerogel Cerenkov ==== | ||
+ | * No update provided | ||
+ | ==== Shower/Pre-shower ==== | ||
− | + | * No update provided |
Latest revision as of 11:54, 3 May 2017
Meeting Information
- Location CC L210A, 11 am
- DocDB
Blue Jeans Connection Information
- https://bluejeans.com/895800575
- Just want to dial in on your phone?
- +1.408.740.7256 (US)
- +1.888.240.2560 (US Toll Free)
- +1.408.317.9253 (Alternate number)
- http://bluejeans.com/numbers
- Enter Meeting ID: 895800575
- Press #
Agenda
- Document on helium limits for PMTs by Dave Mack.
- Triggers required for the upcoming experiments
- Commissioning plan updates from detector systems
- Status update from detector owners, calibrations, efficiencies, etc.
- Review systems owners and update information
- Address system specific points of interest for the Fall 2017 run
Minutes
General
- Dave M. showed some slides regarding helium contamination in Hall C and it's effect on PMT's installed in the Hall
- 2.2 and 6.6 GeV is needed for detector, optics, and acceptance checkout during the Fall 2017 commissioning run
- We have 1 week to perform the commissioning
- There is no time to take our time with performing checkouts
- Everything that is required to perform the checkouts needs to be available and planned out prior to commissioning
- We need to develop a plan for measuring the trigger efficiencies
- The trigger/DAQ configuration requirements for the upcoming experiments need to be provided as soon as possible to the trigger/DAQ group
- Preliminary commissioning plans have been requested from each of the individual detector groups by next meeting
Beam Line
- The super harps have been pulled from the Hall to be re-fiducialized
- Dave G. contacted John and Kieth regarding the bug BPMs
- They had the wrong sign during the Spring 2017 KPP run
- This was known since work was being done on the electronics and software side
- The known helium leak in the dump that was discovered during the KPP run is being investigated
- The leak limits the current that can be delivered into the Hall and must be resolved prior to the Fall commissioning run
- The leak cannot be observed now however, the helium flow has just been restored so they will check again after some time has elapsed
- Everything else in the beam line appears to be good to go
Trigger/DAQ
- The electronic dead time measurement is currently roughed in although it needs to be checked throughly
- Richard Mohring's thesis was mentioned
HMS
6 GeV Drift Chambers
- No update provided
12 GeV Drift Chambers
- Students will become available some time in the next couple of weeks
- Once available, work will resume
Hodoscopes
- No update provided
Aerogel
- No update provided
Heavy Gas Cherenkov
- No update provided
Shower
SHMS
- No update provided
GEM
- No update provided
Nobel Gas Cherenkov
- No update provided
Drift Chambers
- No update provided
Hodoscopes
- Simona provided a nice update, more details to follow...
Heavy Gas Cherenkov
- No update provided
Aerogel Cerenkov
- No update provided
Shower/Pre-shower
- No update provided