Difference between revisions of "Fall 2017 Commissioning Plan"
From HallCWiki
Jump to navigationJump to searchLine 1: | Line 1: | ||
+ | = Table of Commissioning Tasks = | ||
+ | {| border="1" cellpadding="2" valign="top" style="text-align: center;" | ||
+ | | Task | ||
+ | | Person | ||
+ | | Comment | ||
+ | |- | ||
+ | | Harp scans and BPM checkout. Raster checkout. | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | Final HMS and SHMS detector checkout plans. Defocused tune? | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |HMS and SHMS trigger efficiency with Hodo, Hodo+ Cerenkov. | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | HMS and SHMS DC checkout, software alignment and tracking efficiency | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | Beam energy | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | BCM Calibration | ||
+ | | D. Bhetuwal, D Mack | ||
+ | | | ||
+ | |- | ||
+ | | Target Boiling | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |Carbon elastic with sieve for final SHMS tune determination | ||
+ | | M Jones | ||
+ | | | ||
+ | |- | ||
+ | |Carbon elastic scan for delta matrix optimization | ||
+ | | H. Bhatt, D. Dutta | ||
+ | | | ||
+ | |- | ||
+ | | Carbon inelastics with sieve for Ytgt, Y’tgt and X’tgt ( Need 20 deg for Ytgt) | ||
+ | | M Jones | ||
+ | | | ||
+ | |- | ||
+ | | Sieve check after cycling SHMS magnets from positive to negative and back | ||
+ | | M Jones | ||
+ | | | ||
+ | |- | ||
+ | | Determine SHMS central momentum and angle with set of elastic ep data.| | ||
+ | | A. Karki, S. Basnet, D. Dutta | ||
+ | | | ||
+ | |- | ||
+ | |Inelastic carbon xn measurements with overlapping momentum settings to for acceptance check. | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | GEM Front Sieve to better understand HB. Do optics with p+ to check optics. | ||
+ | | L. Kabir, D. Dutta | ||
+ | | | ||
+ | |- | ||
+ | | Coincidence timing checkout and optimization. | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | Electronic deadtime checkout. | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | Single Kaon production. Coincidence p and K production. | ||
+ | | | ||
+ | | | ||
+ | |} | ||
+ | |||
= Fall 2017 Commissioning Plan = | = Fall 2017 Commissioning Plan = | ||
* The plan will be base on the [[Commissioning_Plan_2017 | plan]] of the full SHMS/HMS commissioning. | * The plan will be base on the [[Commissioning_Plan_2017 | plan]] of the full SHMS/HMS commissioning. |
Revision as of 09:56, 12 July 2017
Table of Commissioning Tasks
Task | Person | Comment |
Harp scans and BPM checkout. Raster checkout. | ||
Final HMS and SHMS detector checkout plans. Defocused tune? | ||
HMS and SHMS trigger efficiency with Hodo, Hodo+ Cerenkov. | ||
HMS and SHMS DC checkout, software alignment and tracking efficiency | ||
Beam energy | ||
BCM Calibration | D. Bhetuwal, D Mack | |
Target Boiling | ||
Carbon elastic with sieve for final SHMS tune determination | M Jones | |
Carbon elastic scan for delta matrix optimization | H. Bhatt, D. Dutta | |
Carbon inelastics with sieve for Ytgt, Y’tgt and X’tgt ( Need 20 deg for Ytgt) | M Jones | |
Sieve check after cycling SHMS magnets from positive to negative and back | M Jones | |
A. Karki, S. Basnet, D. Dutta | ||
Inelastic carbon xn measurements with overlapping momentum settings to for acceptance check. | ||
GEM Front Sieve to better understand HB. Do optics with p+ to check optics. | L. Kabir, D. Dutta | |
Coincidence timing checkout and optimization. | ||
Electronic deadtime checkout. | ||
Single Kaon production. Coincidence p and K production. |
Fall 2017 Commissioning Plan
- The plan will be base on the plan of the full SHMS/HMS commissioning.