Difference between revisions of "Fall 2017 Commissioning Plan"
From HallCWiki
Jump to navigationJump to searchLine 53: | Line 53: | ||
| | | | ||
|- | |- | ||
− | | Determine SHMS central momentum and angle with set of elastic ep data. | + | | Determine SHMS central momentum and angle with set of elastic ep data. |
| A. Karki, S. Basnet, D. Dutta | | A. Karki, S. Basnet, D. Dutta | ||
| | | |
Revision as of 14:57, 12 July 2017
Table of Commissioning Tasks
Task | Person | Comment |
Harp scans and BPM checkout. Raster checkout. | ||
Final HMS and SHMS detector checkout plans. Defocused tune? | ||
Checkout of quartz plane | S Malace | |
HMS and SHMS trigger efficiency with Hodo, Hodo+ Cerenkov. | ||
HMS and SHMS DC checkout, software alignment and tracking efficiency | ||
Beam energy | ||
BCM Calibration | D. Bhetuwal, D Mack | |
Target Boiling | ||
Carbon elastic with sieve for final SHMS tune determination | M Jones | |
Carbon elastic scan for delta matrix optimization | H. Bhatt, D. Dutta | |
Carbon inelastics with sieve for Ytgt, Y’tgt and X’tgt ( Need 20 deg for Ytgt) | M Jones | |
Sieve check after cycling SHMS magnets from positive to negative and back | M Jones | |
Determine SHMS central momentum and angle with set of elastic ep data. | A. Karki, S. Basnet, D. Dutta | |
Inelastic carbon xn measurements with overlapping momentum settings to for acceptance check. | ||
GEM Front Sieve to better understand HB. Do optics with p+ to check optics. | L. Kabir, D. Dutta | |
Coincidence timing checkout and optimization. | ||
Electronic deadtime checkout. | ||
Single Kaon production. Coincidence p and K production. |
Fall 2017 Commissioning Plan
- The plan will be base on the plan of the full SHMS/HMS commissioning.