Difference between revisions of "Wednesday, August 23, 2017"

From HallCWiki
Jump to navigationJump to search
Line 25: Line 25:
  
 
=== Beam Line ===
 
=== Beam Line ===
Update on BCM Studies and Calibrations by Deepak
+
#Update on BCM Studies and Calibrations by Deepak
 
+
#See Link.  [https://hallcweb.jlab.org/DocDB/0008/000883/001/Presentation_08_23.pdf Checking Keithley Current Source with a Newly Calibrated Multimeter] - Deepak Bhetuwal
  
 
=== Trigger/DAQ ===
 
=== Trigger/DAQ ===
-Recent update on Trigger/DAQ in preparation for Hall C Fall-2017/Spring-2018
+
#Recent update on Trigger/DAQ in preparation for Hall C Fall-2017/Spring-2018
 
commissioning experiments. Main work has been to clean up unnecessary cable,
 
commissioning experiments. Main work has been to clean up unnecessary cable,
 
and re-route some badly placed cables  
 
and re-route some badly placed cables  
 +
# [https://hallcweb.jlab.org/DocDB/0008/000884/001/Recent_Trigger_DAQ_Work.pdf Recent Trigger/DAQ Work] -Carlos Yero
  
 
-EDTM electronics for HMS/SHMS hodoscopes has been set-up and verified to be working
 
-EDTM electronics for HMS/SHMS hodoscopes has been set-up and verified to be working
Line 38: Line 39:
  
 
==== Magnets ====
 
==== Magnets ====
-characterize Q2 behavior : checking for cross-talk polarity asymmetries, linearity
+
#characterize Q2 behavior : checking for cross-talk polarity asymmetries, linearity
-Dave Mack is skeptical about the errors obtained in the measurement of Q2 field using the Hall probe.
+
#Dave Mack is skeptical about the errors obtained in the measurement of Q2 field using the Hall probe.
-The hall probe might not work as it should for such strong magnetic field gradients according to D. Mack
+
#The hall probe might not work as it should for such strong magnetic field gradients according to D. Mack
 +
#[https://userweb.jlab.org/~hszumila/hallc/q2update_23aug17.pdf Q2 Measurements Update] - Holly

Revision as of 11:04, 23 August 2017

Meeting Information

  • Location CC L210A, 11 am
  • DocDB

Blue Jeans Connection Information

  1. Enter Meeting ID: 895800575
  2. Press #

Agenda

  1. Commissioning plan updates from detector systems
  2. Status update from detector owners, calibrations, efficiencies, etc.
    1. Checking Keithley Current Source with a Newly Calibrated Multimeter - Deepak Bhetuwal
    2. Recent Trigger/DAQ Work -Carlos Yero
    3. Q2 Measurements Update - Holly
  3. Review systems owners and update information
  4. Address system specific points of interest for the Fall 2017 run

Minutes

Beam Line

  1. Update on BCM Studies and Calibrations by Deepak
  2. See Link. Checking Keithley Current Source with a Newly Calibrated Multimeter - Deepak Bhetuwal

Trigger/DAQ

  1. Recent update on Trigger/DAQ in preparation for Hall C Fall-2017/Spring-2018

commissioning experiments. Main work has been to clean up unnecessary cable, and re-route some badly placed cables

  1. Recent Trigger/DAQ Work -Carlos Yero

-EDTM electronics for HMS/SHMS hodoscopes has been set-up and verified to be working

SHMS

Magnets

  1. characterize Q2 behavior : checking for cross-talk polarity asymmetries, linearity
  2. Dave Mack is skeptical about the errors obtained in the measurement of Q2 field using the Hall probe.
  3. The hall probe might not work as it should for such strong magnetic field gradients according to D. Mack
  4. Q2 Measurements Update - Holly